Back-up Power Source Circuit
Circuit diagnosis · Vehicles built from Aug 2005
DESCRIPTION
This is back-up power source circuit for the air conditioning amplifier. Power is supplied even when the ignition switch is turned off and is used for functions such as the diagnostic trouble code memory.WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. INSPECT FUSE (ECU-B) |
Remove the ECU-B fuse from the engine room relay block.

Measure the resistance.
- Standard resistance:
- Below 1 Ω
Reinstall the ECU-B fuse.
|
|
||||
| OK | |
| 2. CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BATTERY) |
![]() ![]() |
Disconnect the E11 air conditioning amplifier connector.
Measure the voltage.
- Standard voltage:
Tester Connection
Condition
Specified Condition
E11-21 (B) - Body ground
Always
10 to 14 V
Reconnect the air conditioning amplifier connector.
|
|
||||
| OK | |
| 3. CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BODY GROUND) |
![]() ![]() |
Disconnect the E11 air conditioning amplifier connector.
Measure the resistance.
- Standard resistance:
Tester Connection
Specified Condition
E11-14 (GND) - Body ground
Below 1 Ω
Reconnect the air conditioning amplifier connector.
|
|
||||
| OK | ||
| ||


