2005-2008 Yaris · Service Manual
ENGINE
Home
›
ENGINE
› 2SZ-FE ENGINE CONTROL SYSTEM › CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
INSTALLATION
Removal / installation
·
Vehicles built from Nov 2005
1. INSTALL CAM TIMING OIL CONTROL VALVE ASSEMBLY
Install the cam timing oil control valve assembly with the bolt.
Torque:
7.5 N*m{ 76 kgf*cm , 66 in.*lbf }
Connect the connector.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
3. CHECK FOR ENGINE OIL LEAKAGE
← INSPECTION (from Nov 2005)
COMPONENTS (from Nov 2005) →