2005-2008 Yaris · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Nov 2005


1. INSTALL STARTER ASSEMBLY (for C551A)

  1. A117392
    Install the starter assembly with the 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. Connect the connector.

  1. Connect terminal 30 with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Close the terminal cap.

  1. Install the harness clamp.


2. INSTALL STARTER ASSEMBLY (for C551)

  1. A117391
    Install the starter assembly with the 2 bolts.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the connector.

  1. Connect terminal 30 with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Close the terminal cap.

  1. Install the harness clamp.

  1. A115443
    Install the wire harness bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. A115442
    Install the harness clamp.


3. INSTALL FLYWHEEL HOUSING SIDE COVER

  1. A127299
    Insert the protruding portion into the end of the cylinder block and while pushing it along the cylinder block, fit the claw into the cylinder block.

    NOTICE:
    1. Make sure that the claw makes a click sound, indicating that it fits tightly.
    2. Replace the claw with a new one if it does not fit tightly or is deformed.


4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (for C551A)

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }


5. INSTALL BATTERY TRAY (for C551)

6. INSTALL BATTERY (for C551)
← REASSEMBLY (from Nov 2005)ON-VEHICLE INSPECTION (from Aug 2005) →