INSTALLATION
Removal / installation · Vehicles built from Nov 2006
| 1.
INSTALL NO. 1 IGNITION COIL |
 |
- Install the 4 ignition coils with the 4 bolts.
-
Torque:
- 10 N*m{
102 kgf*cm
, 7 ft.*lbf
}
- NOTICE:
- Do not damage the rubber ignition coil tips when installing the ignition coils.
Connect the 4 ignition coil connectors.
- Connect the camshaft timing oil control valve connector.
| 2.
INSTALL NO. 2 CYLINDER HEAD COVER |
 |
- Disengage the 4 fittings shown and install the No. 2 cylinder head cover by applying pressure to it.
- HINT:
- Make sure that the oil and the engine oil level dipstick are correctly installed before installing the No. 2 cylinder head cover.
| 3.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
 |
-
Torque:
- 5.4 N*m{
55 kgf*cm
, 48 in.*lbf
}