2007 Compass Patriot MK Factory Service Manual 7 - COOLING

INSTALLATION

GAS ENGINE


COOLANT ADAPTER MOUNTED




1. Install ECT Sensor (1). Make sure coolant sensor is locked in place
2. Reconnect ECT Sensor electrical connector.
3. Fill cooling system
(Refer to 7 - COOLING/ENGINE - STANDARD PROCEDURE).
4. Connect negative battery cable.

CYLINDER BLOCK MOUNTED




1. Install ECT Sensor. Tighten sensor to 19 N·m (168 in. lbs.).
2. Reconnect ECT Sensor electrical connector.
3. Fill cooling system
(Refer to 7 - COOLING/ENGINE - STANDARD PROCEDURE).
4. Connect negative battery cable.

DIESEL ENGINE




1. Position and install coolant temperature sensor (5).
2. Connect coolant temperature sensor electrical connector.



3. Refill coolant system to proper level with proper mixture of coolant
(Refer to 7 - COOLING/ENGINE/COOLANT - STANDARD PROCEDURE).
4. Install engine cover (Refer to 9 - ENGINE - INSTALLATION).
5. Connect negative battery cable.

WARNING: USE EXTREME CAUTION WHEN ENGINE IS OPERATING. DO NOT STAND IN A DIRECT LINE WITH FAN. DO NOT PUT YOUR HANDS NEAR PULLEYS, BELTS OR FAN. DO NOT WEAR LOOSE CLOTHES.


6. Start engine and inspect for leaks.