CAUTION
Fuel injection systems remain under pressure after the engine has been
turned OFF. Properly relieve fuel pressure before disconnecting any fuel
lines. Failure to do so may result in fire or personal injury.
- Relieve the fuel system pressure, and disconnect
the negative battery cable.
- Drain the cooling system.
- Remove the dynamic chamber cover.
- Remove the charge air cooler air duct.
- Label and disconnect the vacuum hoses and electrical
connectors from the air cleaner housing. Remove the air cleaner assembly.
- Remove the air and fresh air ducts.
- Remove the mass air flow sensor and the air intake
hose from the throttle body.
- Remove the resonator.
- Remove the right-hand charge air cooler.
- Remove the left-hand charge air cooler.
- Disconnect the accelerator cable.
- Label and disconnect the necessary vacuum hoses from
the rear of the intake manifold and EGR valve.
- Remove the EGR valve.
- Remove the air intake pipe assembly.
- Remove the charge air cooler pipe.
-
Disconnect and plug the fuel supply line at the fuel rails and discard
the copper crush washers. Disconnect the fuel and vacuum lines from the
fuel pressure regulator.
CAUTION
Do not allow fuel spray or fuel vapors to come in contact with a spark
or open flame. Keep a dry chemical fire extinguisher nearby. Never store
fuel in an open container due to risk of fire or explosion.
- Disconnect and plug the coolant hoses.
- Remove the harness from the intake manifold.
- Remove the intake manifold mounting nuts and bolts
in 2-3 steps, then remove the intake manifold.
- Label and disconnect the fuel hoses and electrical
connectors from the throttle body. Remove the throttle body.
- Remove the drive belt from the Lysholm compressor
(supercharger).
-
Remove the mounting bolts from the Lysholm compressor, and remove the
compressor from the vehicle.
To install:
- Clean all gasket mating surfaces.
- Position the rubber shield for the Lysholm compressor
onto the compressor using double sided adhesive tape. Place the compressor
onto the mounting studs and tighten the mounting nuts to 14-18 ft. lbs.
(19-25 Nm).
- Install and adjust the drive belt.
- Install the throttle body. Tighten the nuts and bolts
to 14-18 ft. lbs. (19-25 Nm), and connect the fuel hoses and electrical
connectors.
- Position new gaskets and install the intake manifold.
Tighten the nuts and bolts in 2-3 steps, from the center to the ends,
to 14-18 ft. lbs. (19-25 Nm).
- Install the harness onto the intake manifold.
- Unplug and and connect the coolant hoses.
- Connect the fuel and vacuum lines to the fuel pressure
regulator. Connect the fuel supply line to the fuel rail, using new copper
crush washers.
- Install the charge air cooler pipe.
- Position the air intake pipe assembly using new gaskets.
Hand tighten the nuts and bolts in the order shown in the graphic until
the air intake pipe contacts the intake manifold. Verify that the rubber
gaskets are not twisted or distorted. Tighten the bolts marked A
to 70-95 inch lbs. (8-11 Nm), and all others, in sequence, to 14-18 ft.
lbs. (19-25 Nm).
- Install the EGR valve using a new gasket.
- Connect the vacuum hoses to the intake manifold and
EGR valve.
- Connect and adjust the accelerator cable.
- Using new gaskets, position the left and right-hand
charge air coolers. Hand tighten the nuts and bolts in the order shown
in the graphic until the air intake pipes and charge air coolers contact
the intake manifold. Verify that the rubber gaskets are not twisted or
distorted. Tighten the bolts marked A to 44-78 inch lbs. (5-9 Nm).
Tighten the bolts marked B to 70-95 inch lbs. (8-11 Nm), and all
others, in sequence, to 14-18 ft. lbs. (19-25 Nm).
- Install the resonator. Tighten the nuts and bolts
to 12-16 ft. lbs. (16-22 Nm)
- Install the air intake hose onto the throttle body.
Install the mass air flow sensor.
- Install the fresh air and air ducts.
- Install the air cleaner assembly and connect the
vacuum hoses and electrical connectors to the air cleaner housing.
- Install the charge air cooler air duct. Tighten the
mounting bolts to 70-95 inch lbs. (8-11 Nm).
- Install the dynamic chamber cover.
- Connect the negative battery cable.
- Fill and bleed the cooling system. Run the engine
and check for leaks.