STEP 1. M.U.T.-IIISE data list
STEP 2. Check No. 2 intake air temperature sensor itself.
STEP 3. Perform voltage measurement at boost pressure sensor connector.
- Disconnect connector, and measure at harness side.
- Ignition switch: ON
- Voltage between terminal engine-ECU UATS line and body earth.
OK: 4.5 - 4.9 V
Is the check result normal?
Go to Step 6.
Go to Step 4.
STEP 4. Check of open circuit in UATS line between boost pressure sensor connector and engine-ECU connector.
Is the check result normal?
Go to Step 5.
Repair the connector(s) or wiring harness.
STEP 5. M.U.T.-IIISE data list
STEP 6. Perform resistance measurement at boost pressure sensor connector.
- Disconnect connector, and measure at harness side.
- Resistance between terminal engine-ECU E line and body earth.
OK: Continuity (2 Ω or less)
Is the check result normal?
Go to Step 8.
Go to Step 7.
STEP 7. Check of open circuit, and damage in E line between boost pressure sensor connector and engine-ECU connector.
Is the check result normal?
Go to Step 5.
Repair the connector(s) or wiring harness.
STEP 8. Check of damage in UATS line between boost pressure sensor connector and engine-ECU connector.
Is the check result normal?
Go to Step 5.
Repair the connector(s) or wiring harness.