Pre-removal and Post-installation Operation - Engine Room Under Cover Front A, B and Engine Room Side Cover (RH) Removal and Installation (Refer to GROUP 51 - Under Cover
). - Engine Coolant Draining and Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement
). - Engine Oil Draining and Refilling (Refer to GROUP 12 - On-vehicle Service, Engine Oil Replacement
). - Engine Cover Removal (Refer to GROUP 11A - Engine Cover
). - Intercooler Intake Air Hose A Removal and Installation (Refer to
). - Air Cleaner Assembly Removal and Installation (Refer to
). - Front Exhaust Pipe Removal and Installation (Refer to
). - Strut Tower Bar Removal and Installation (Refer to GROUP 42A - Strut Tower Bar
).
|