2018 / ECLIPSE CROSS / EC - Workshop Manual
23 -AUTOMATIC TRANSMISSION > 23A-CVT > INHIBITOR SWITCH > INHIBITOR SWITCH REMOVAL AND INSTALLATION
REMOVAL AND INSTALLATION
 
 
Pre-removal operation
  • Air Cleaner Assembly Removal (Refer to GROUP 15 - Air Cleaner ).
  • Battery and Battery Tray Removal (Refer to GROUP 54A - Battery ).
Post-installation operation
  • Battery and Battery Tray Installation (Refer to GROUP 54A - Battery ).
  • Air Cleaner Assembly Installation (Refer to GROUP 15 - Air Cleaner ).
  • Inhibitor Switch and Control Cable Adjustment (Refer to ).
 
Removal steps
1.Harness bracket connection
2.Transmission control cable connection
3.Manual control lever
4.Inhibitor switch