Home › Engine / Hybrid System › 1GR-FE EMISSION CONTROL › AIR SWITCHING VALVE(for Bank 1) › from 2014.08
RM1440E _51 Engine / Hybrid System _056127 1GR-FE EMISSION CONTROL _0273902 AIR SWITCHING VALVE(for Bank 1) A

1GR-FE EMISSION CONTROL  AIR SWITCHING VALVE(for Bank 1)  INSTALLATION  


PROCEDURE

Hide 25701B 1.INSTALL NO. 1 EMISSION CONTROL VALVE SET

a.

Install the No. 1 emission control valve set with the 3 nuts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


b.
A288448E03
0.698,0.25 0.802,0.25 0.802,0.25 1.052,0.792 true 1.625,1.125 1.552,1.125 1.552,1.125 1.281,0.833 true 2.99,0.188 3.167,0.365 0.177,0.177 10 false *a 1.958,0.76 2.125,0.948 0.167,0.188 10 true *b 0.51,0.177 0.688,0.354 0.177,0.177 10 false *1 1.656,1.052 1.833,1.229 0.177,0.177 10 false *2 2.177,0.958 2.438,1.104 0.26,0.146 10 false 60°

Align the paint mark with the projection and connect the No. 1 air hose.

Text in Illustration
*1 Projection
*2 Paint mark
*a RH Side
*b Upper

HINT:

Make sure the direction of the hose clamp is as shown in the illustration.



c.

Connect the No. 1 emission control valve set connector.


Hide 17361 2.INSTALL AIR TUBE

a.
A289302E03
2.49,0.979 2.552,1.135 2.552,1.135 2.604,1.135 false 2.875,0.76 2.938,0.917 2.938,0.917 2.99,0.917 false 3.01,0.844 3.219,1.01 0.208,0.167 10 false *2 2.656,1.052 2.865,1.219 0.208,0.167 10 false *1

Install 2 new gaskets to the air tube.

Text in Illustration
*1 New Gasket
*2 Air Tube

NOTICE:

Be careful not to damage the installation surfaces of the gaskets.



b.

Install the air tube with the 2 bolts and 2 nuts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)