Home › Engine / Hybrid System › 1GR-FE EMISSION CONTROL › AIR SWITCHING VALVE(for Bank 1) › from 2014.08
RM1440E _51 Engine / Hybrid System _056127 1GR-FE EMISSION CONTROL _0273902 AIR SWITCHING VALVE(for Bank 1) A

1GR-FE EMISSION CONTROL  AIR SWITCHING VALVE(for Bank 1)  REMOVAL  


PROCEDURE

Hide 17361 3.REMOVE AIR TUBE

a.
A288445

Remove the 2 bolts, 2 nuts and air tube.


b.

Remove the 2 gaskets from the air tube.

NOTICE:

Be careful not to damage the installation surfaces of the gaskets.



Hide 25701B 4.REMOVE NO. 1 EMISSION CONTROL VALVE SET

a.
A288446

Disconnect the No. 1 emission control valve set connector.


b.

Disconnect the No. 1 air hose from the No. 1 emission control valve set.


c.
A288447

Remove the 3 nuts and No. 1 emission control valve set.