Home › Audio / Visual / Telematics › NAVIGATION / MULTI INFO DISPLAY › NAVIGATION ANTENNA

NAVIGATION ANTENNA > INSTALLATION

for Preparation Click here



1. INSTALL NAVIGATION ANTENNA ASSEMBLY
  1. Install the antenna with the 2 screws.

    Torque:
    2.5 N*m{ 25 kgf*cm , 22 in.*lbf }

  1. Attach the clamp.



2. INSTALL DEFROSTER NOZZLE ASSEMBLY
  1. Install the defroster nozzle assembly with the 3 screws.



3. INSTALL NO. 3 HEATER TO REGISTER DUCT
  1. Attach the claw.

  1. Install the No. 3 heater to register duct with the 2 screws.



4. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT
  1. Attach the 2 claws.

  1. Install the No. 2 side defroster nozzle duct with the screw.



5. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT
  1. Attach the 2 claws.

  1. Install the No. 1 side defroster nozzle duct with the screw.



6. INSTALL NO. 2 HEATER TO REGISTER DUCT
  1. Install the No. 2 heater to register duct with the 4 screws.



7. INSTALL NO. 1 HEATER TO REGISTER DUCT
  1. Install the No. 1 heater to register duct with the 4 screws.



8. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
  1. Install the instrument panel sub-assembly (Click here).



9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).