Home › Engine / Hybrid System › FA20 INTAKE / EXHAUST › EXHAUST MANIFOLD

EXHAUST MANIFOLD > INSTALLATION

for Preparation Click here



1. INSTALL EXHAUST MANIFOLD
  1. Install 2 new gaskets.

  1. Install the exhaust manifold with the 6 new nuts.

    Torque:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }

    NOTICE:
    Do not reuse the nuts.

  1. Install new gasket to the exhaust manifold.

  1. Install 2 new nuts and the front exhaust pipe sub-assembly.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }



2. INSTALL FRONT EXHAUST PIPE ASSEMBLY
  1. Temporarily install the front exhaust pipe assembly to the bracket with the bolt.

  1. Install the new gaskets and the front exhaust pipe assembly to the center exhaust pipe assembly with the 2 nuts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    NOTICE:
    1. Do not reuse the gaskets.
    2. Do not reuse the nuts.

  1. Install the new gaskets and the front exhaust pipe assembly to the front exhaust pipe sub-assembly with the 2 new nuts.

    Torque:
    43 N*m{ 439 kgf*cm , 32 ft.*lbf }

    NOTICE:
    1. Do not reuse the gaskets.
    2. Do not reuse the nuts.

  1. Fully tighten the bolt.

    Torque:
    50 N*m{ 510 kgf*cm , 37 ft.*lbf }



3. INSTALL NO. 2 ENGINE UNDER COVER
  1. Install the 7 bolts and the No. 2 engine under cover.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



4. INSTALL HEATED OXYGEN SENSOR
(Click here)


5. INSTALL AIR FUEL RATIO SENSOR
(Click here)


6. INSPECT FOR EXHAUST GAS LEAK
  1. If gas is leaking, tighten the areas necessary to stop the leak. Replace the damaged parts as necessary.