Home › Engine / Hybrid System › FA20 EMISSION CONTROL › PCV VALVE
RM2090E _51 Engine / Hybrid System _060668 FA20 EMISSION CONTROL _0297513 PCV VALVE A

FA20 EMISSION CONTROL  PCV VALVE  INSTALLATION  


PROCEDURE

Hide 12204 1.INSTALL PCV VALVE SUB-ASSEMBLY

a.
A092670

Apply adhesive to 2 or 3 threads of the PCV valve sub-assembly.

Adhesive:

Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent



b.

Using a 19 mm deep socket wrench, install the PCV valve sub-assembly.

Torque:
23 N*m (235 kgf*cm, 17 ft.*lbf)


c.

Connect the ventilation hose.