Home › Engine / Hybrid System › 2NR-VE LUBRICATION › OIL PRESSURE SWITCH › from 2015.08
RM19Y0E _51 Engine / Hybrid System _042284 2NR-VE LUBRICATION _0196249 OIL PRESSURE SWITCH A

2NR-VE LUBRICATION  OIL PRESSURE SWITCH  REMOVAL  


PROCEDURE

Hide 1.REMOVE CABLE FROM NEGATIVE BATTERY TERMINAL

Hide 17750A 4.REMOVE AIR CLEANER INLET ASSEMBLY

Hide 17775A 5.REMOVE NO. 3 AIR CLEANER PIPE BRACKET

Hide 16361A 6.REMOVE FAN AND GENERATOR V BELT

Hide 88320 7.SEPARATE COOLER COMPRESSOR ASSEMBLY

Hide 51443 8.REMOVE NO. 2 ENGINE UNDER COVER (w/ No. 2 Engine Under Cover)

Hide 12311 9.REMOVE FRONT NO. 1 ENGINE MOUNTING BRACKET RH

a.
A363053

Support the engine with a jack and a wooden block in the positions shown in the illustration.


b.
A363063

Remove the 5 bolts and front No. 1 engine mounting bracket RH with front engine mounting insulator.


Hide 83530 10.REMOVE ENGINE OIL PRESSURE SWITCH ASSEMBLY

a.

Disconnect the engine oil pressure switch assembly connector.


b.
A361320

Using a 24 mm deep socket wrench, remove the engine oil pressure switch assembly.