The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the transmission oil cooler removal/installation are shown below.
51441
1.REMOVE NO. 1 ENGINE UNDER COVER
51444A
2.REMOVE REAR ENGINE UNDER COVER LH
3.DRAIN ENGINE COOLANT
4.DRAIN CONTINUOUSLY VARIABLE TRANSAXLE FLUID
33493C
5.REMOVE TRANSMISSION OIL COOLER
| *1 | No. 3 Water By-pass Hose |
| *2 | No. 4 Water By-pass Hose |
Slide the 2 clips and disconnect the No. 3 water by-pass hose and No. 4 water by-pass hose from the transmission oil cooler.
Remove the 3 bolts and transmission oil cooler from the continuously variable transaxle assembly.
Remove the 2 O-rings from the transmission oil cooler.