Home › Engine / Hybrid System › 8NR-FTS (EMISSION CONTROL) › VACUUM REGULATING VALVE › from 2019.09
RM32H0E _51 Engine / Hybrid System _060038 8NR-FTS EMISSION CONTROL _0294115 VACUUM REGULATING VALVE A

8NR-FTS EMISSION CONTROL  VACUUM REGULATING VALVE  INSTALLATION  


PROCEDURE

Hide 25819 1.INSTALL VACUUM REGULATING VALVE ASSEMBLY (w/ Differential Pressure Sensor)

a.

Install the vacuum regulating valve assembly to the No. 2 vacuum switching valve bracket with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 3 vacuum transmitting hose and No. 4 vacuum transmitting hose to the vacuum regulating valve assembly.


c.

Connect the vacuum regulating valve assembly connector.


Hide 25819 2.INSTALL VACUUM REGULATING VALVE ASSEMBLY (w/o Differential Pressure Sensor)

a.

Install the vacuum regulating valve assembly to the No. 2 vacuum switching valve bracket with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 3 vacuum transmitting hose and No. 4 vacuum transmitting hose to the vacuum regulating valve assembly.


c.

Connect the vacuum regulating valve assembly connector.


Hide 55701J 3.INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY (for LHD)

Hide 55701J 4.INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY (for RHD)

Hide 55735C 5.INSTALL COWL BODY MOUNTING REINFORCEMENT RH

Hide 55736D 6.INSTALL COWL BODY MOUNTING REINFORCEMENT LH

Hide 55735A 7.INSTALL WATER GUARD PLATE LH (for TMC Made RHD)

Hide 55737B 8.INSTALL NO. 1 HEATER AIR DUCT SPLASH SHIELD SEAL

Hide 9.INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY