ENGINE ASSEMBLY > INSTALLATION |
| 1. INSTALL ENGINE COOLANT TEMPERATURE SENSOR |
![]() |
Using a 19 mm deep socket wrench, install the engine coolant temperature sensor and a new gasket.
| 2. INSTALL KNOCK CONTROL SENSOR |
![]() |
Install the 2 knock control sensors with the 2 bolts as shown in the illustration.
Connect the 2 knock control sensor connectors.
| 3. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY |
![]() |
Clean the threads of the oil pressure switch. Apply adhesive to 2 or 3 threads of the oil pressure switch.
![]() |
Using a 24 mm deep socket wrench, install the oil pressure switch.
| 4. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY |
![]() |
Install the bolt and No. 1 vacuum switching valve.
| 5. INSTALL RADIO SETTING CONDENSER |
![]() |
Install the 2 bolts and 2 radio setting condensers.
| 6. INSTALL NO. 1 ENGINE MOUNTING BRACKET FRONT LH |
![]() |
Install the No. 1 engine mounting bracket front LH with the 6 bolts.
| 7. INSTALL WATER PUMP PULLEY |
![]() |
Temporarily install the water pump pulley with the 4 bolts.
Using SST, hold the water pump pulley.
Tighten the 4 bolts.
| 8. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY |
![]() |
Install the No. 2 idler pulley sub-assembly and 2 plates with the bolt.
| 9. INSTALL NO. 2 TIMING GEAR COVER |
![]() |
Install the No. 2 timing gear cover with the 2 bolts.
| 10. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
![]() |
Temporarily install the V-ribbed belt tensioner with the 5 bolts.
Install the V-ribbed belt tensioner by tightening the bolt 1 and bolt 2 in the order shown in the illustration.
Tighten the other bolts.
| 11. INSTALL DRIVE SHAFT BEARING BRACKET |
![]() |
Install the drive shaft bearing bracket with the 3 bolts.
| 12. INSTALL ENGINE MOUNTING BRACKET RH |
![]() |
Install the engine mounting bracket RH with the 3 bolts.
| 13. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH |
![]() |
Install a new gasket as shown in the illustration.
![]() |
Install the exhaust manifold sub-assembly LH with the 6 nuts.
| 14. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR |
![]() |
Install the No. 2 insulator with the 3 bolts.
| 15. INSTALL NO. 2 MANIFOLD STAY |
![]() |
Install the No. 2 manifold stay with the bolt and nut.
| 16. INSTALL OIL LEVEL GAUGE GUIDE SUB-ASSEMBLY |
![]() |
Install 2 new O-rings to the oil level gauge guide.
Apply a light coat of engine oil to the O-rings.
Push in the oil level gauge guide end into the guide hole.
Install the oil level gauge guide No. 1 with the bolt.
Install the oil level gauge guide No. 2 with the bolt.
Install the oil level gauge.
| 17. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH |
![]() |
Install a new gasket as shown in the illustration.
![]() |
Install the exhaust manifold sub-assembly RH with the 6 nuts.
| 18. INSTALL INTAKE MANIFOLD |
| Components | ||
| Intake Manifold and Cylinder Head Sub-assembly RH | ||
| Intake Manifold and Cylinder Head Sub-assembly LH |
![]() |
Set a new gasket on each cylinder head.
Set the intake manifold on the cylinder heads.
Install and tighten the 6 bolts and 4 nuts uniformly in several steps.
| 19. INSTALL NO. 2 ENGINE MOUNTING STAY RH |
Install the No. 2 mounting stay RH with the bolt.
| 20. INSTALL IGNITION COIL ASSEMBLY |
Install the 6 ignition coil assemblies with the 6 bolts.
| 21. INSTALL INTAKE AIR SURGE TANK ASSEMBLY |
| Components | ||
| Surge Tank and Intake Manifold | ||
| No. 1 Surge Tank Stay and Cylinder Head Cover | ||
| No. 1 Surge Tank Stay and Surge Tank | ||
| Throttle Body Bracket and Cylinder Head Cover | ||
| Throttle Body Bracket and Surge Tank |
Install a new gasket to the intake air surge tank.
![]() |
Using a 5 mm hexagon socket wrench, install the 4 bolts and 2 nuts.
Install the throttle body bracket, No. 1 surge tank stay and 4 bolts.
![]() |
Connect the connector.
![]() |
Install the vacuum hose clamp with the bolt.
Connect the No. 1 ventilation hose.
![]() |
Install the clamp and connect the throttle body assembly connector (*3).
Connect the vapor feed hose (*2).
Connect the 2 water by-pass hoses to the throttle body assembly (*1).
| 22. REMOVE ENGINE STAND |
| 23. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY |
![]() |
Using SST, hold the crankshaft.
![]() |
Apply adhesive to 2 or 3 threads of the mounting bolt end.
![]() |
Install the front spacer, drive plate and rear spacer on the crankshaft.
Install and tighten the 8 mounting bolts uniformly in several steps.
| 24. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY |
| 25. INSTALL STARTER ASSEMBLY |
![]() |
Install the starter assembly with the 2 bolts.
Connect the wire harness to terminal 30 and install the nut. Then, attach the terminal cap.
Connect the terminal 50 connector to the starter assembly.
| 26. INSTALL ENGINE WIRE |
| 27. INSTALL FRONT DRIVE SHAFT ASSEMBLY LH |
![]() |
Coat the spline of the inboard joint shaft assembly with ATF.
Align the shaft splines and install the drive shaft assembly LH with a brass bar and hammer.
| 28. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH |
![]() |
Coat the spline of the inboard joint shaft assembly with ATF.
Install the front drive shaft the assembly RH.
Using a screwdriver, install a new bearing bracket hole snap ring.
Install a new bolt.
| 29. INSTALL FRONT FRAME ASSEMBLY |
![]() |
Install the engine mounting insulators RH and LH with the 2 nuts.
![]() |
Install the engine mounting insulator FR with the bolt.
![]() |
Connect the connector and clamp.
![]() |
Connect the 2 clamps.
| 30. INSTALL VANE PUMP ASSEMBLY |
![]() |
Install the vane pump with the 2 bolts.
Install the pressure feed tube clamp bolt.
Connect the power steering oil pressure switch connector.
| 31. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE |
![]() |
Set the engine assembly with transaxle on the engine lifter.
Install the engine assembly to the vehicle.
Install the frame side rail plates RH and LH with the 4 bolts and 2 nuts.
Install the front suspension member brace rear RH and LH with the 4 bolts and 2 nuts.
| 32. INSTALL COOLER COMPRESSOR ASSEMBLY |
![]() |
Temporarily install the cooler compressor with the 4 bolts.
Install the compressor with the 4 bolts by tightening the bolts in the order shown in the illustration.
Install the 2 connector clamps.
| 33. INSTALL GENERATOR ASSEMBLY |
![]() |
Install the bracket with the bolt.
![]() |
Install the wire harness clamp stay with the bolt.
![]() |
Connect the wire harness clamp.
Install the generator assembly to the cylinder block with the bolt.
![]() |
Install the 2 bolts.
![]() |
Connect the generator connector to the generator assembly.
Install the generator wire with the nut.
Install the terminal cap.
Connect the 2 wire harness clamps.
Connect the magnetic clutch connector to the compressor and magnetic clutch.
| 34. INSTALL STEERING SLIDING YOKE |
![]() |
Align the matchmarks on the steering sliding yoke and the steering link assembly.
![]() |
Install the bolt.
| 35. INSTALL DRIVE PLATE AND TORQUE CONVERTER CLUTCH SETTING BOLT |
![]() |
Apply a few drops of adhesive to 2 threads on the tip of the 6 torque converter clutch mounting bolts.
![]() |
Install the 6 torque converter clutch mounting bolts.
| 36. INSTALL NO. 1 EXHAUST PIPE SUPPORT BRACKET |
Install the No. 1 exhaust pipe support bracket with the bolt.
| 37. INSTALL FRONT AXLE ASSEMBLY LH |
![]() |
Align the matchmarks and install the front drive shaft assembly to the front axle hub sub-assembly.
| 38. INSTALL FRONT AXLE ASSEMBLY RH |
| 39. INSTALL FRONT SUSPENSION LOWER NO. 1 ARM LH |
![]() |
Install the lower ball joint to the front suspension lower No. 1 arm with the bolt and 2 nuts.
| 40. INSTALL FRONT SUSPENSION LOWER NO. 1 ARM RH |
| 41. INSTALL TIE ROD ASSEMBLY LH |
Install the tie rod end sub-assembly to the steering knuckle with the nut.
Install a new cotter pin.
| 42. INSTALL TIE ROD ASSEMBLY RH |
| 43. INSTALL FRONT SPEED SENSOR LH |
![]() |
Install the front speed sensor to the steering knuckle with the bolt.
![]() |
Install the flexible hose and the speed sensor to the shock absorber with the bolt and set the sensor clip on the knuckle.
| 44. INSTALL FRONT SPEED SENSOR RH |
| 45. INSTALL FRONT STABILIZER LINK ASSEMBLY LH |
![]() |
Install the stabilizer link assembly with the nut.
| 46. INSTALL FRONT STABILIZER LINK ASSEMBLY RH |
| 47. INSTALL FRONT AXLE HUB NUT LH |
Clean the threaded parts on the drive shaft and front axle hub nut using a non-residue solvent.
![]() |
Using a socket wrench (30 mm), install a new axle hub nut.
Using a chisel and hammer, stake the front axle hub nut.
| 48. INSTALL FRONT AXLE HUB NUT RH |
| 49. INSTALL EXHAUST PIPE ASSEMBLY FRONT |
Install a new gasket onto the front exhaust pipe assembly.
Install the front exhaust pipe assembly with the 2 nuts.

Install the front exhaust pipe No. 1 support bracket with the 2 nuts .
| 50. INSTALL EXHAUST PIPE NO. 1 SUPPORT BRACKET |
![]() |
Install the front support brackets with the 2 nuts.
| 51. CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE |
![]() |
Connect the No. 1 oil reservoir to pump hose.
| 52. CONNECT RETURN TUBE SUB-ASSEMBLY |
![]() |
Connect the return tube sub-assembly.
| 53. CONNECT FUEL TUBE SUB-ASSEMBLY |
![]() |
Push in the fuel tube connector to the fuel pipe until the connector makes a "click" sound.
![]() |
Install the No. 1 fuel pipe clamp.
| 54. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY |
![]() |
Install the clip and nut to connect the cable to the transaxle.
| 55. CONNECT ENGINE WIRE |
![]() |
Install the bolt and clamp to the bracket.
![]() |
Install the 2 bolts and 2 clamps to the body.
![]() |
Connect the connectors to the engine room junction block. Then, install it with the nut and 3 connectors.
| 56. INSTALL RELAY BLOCK COVER UPPER |
| 57. INSTALL ECM |
| 58. CONNECT HEATER WATER HOSE INLET |
![]() |
Connect the heater inlet water hose.
| 59. CONNECT HEATER WATER HOSE OUTLET |
Connect the heater outlet water hose.
| 60. CONNECT NO. 1 OIL COOLER INLET HOSE |
![]() |
Install the clamp and connect the oil cooler inlet hose.
| 61. CONNECT NO. 1 OIL COOLER OUTLET HOSE |
Install the clamp and connect the oil cooler outlet hose.
| 62. INSTALL RADIATOR HOSE INLET |
![]() |
Install the clamp and connect the radiator hose inlet.
| 63. INSTALL RADIATOR HOSE OUTLET |
![]() |
Install the clamp and connect the radiator hose outlet.
| 64. CONNECT CHECK VALVE TO BRAKE BOOSTER HOSE |
![]() |
Install the clamp and connect the check valve to brake booster hose.
| 65. CONNECT NO. 1 FUEL VAPOR FEED HOSE |
![]() |
Install the clamp and connect the No. 1 fuel vapor feed hose.
| 66. INSTALL ENGINE MOVING CONTROL ROD SUB-ASSEMBLY |
![]() |
Temporarily install the engine moving control rod with the 4 bolts.
First install the bolts labeled A in the illustration, and then the remaining bolt B.
| 67. INSTALL NO. 2 ENGINE MOUNTING STAY RH |
![]() |
Temporarily install the No. 2 engine mounting stay RH with the bolt.
Tighten the 2 nuts.
| 68. INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY |
![]() |
Install the intake air resonator with the bolt and clip.
| 69. INSTALL BATTERY |
![]() |
Install the battery and battery tray.
Install the battery clamp with the bolt and nut.
| 70. INSTALL NO. 1 AIR CLEANER INLET |
![]() |
Install the No. 1 air cleaner inlet with the bolt.
| 71. INSTALL AIR CLEANER CASE SUB-ASSEMBLY |
![]() |
Install the air cleaner case with the 3 bolts.
Connect the vacuum hose and hose clamp.
| 72. INSTALL AIR CLEANER CAP SUB-ASSEMBLY |
![]() |
Install the air cleaner cap sub-assembly, and connect the 3 bands.
![]() |
Connect the mass air flow meter connector (*1).
Connect the No. 2 ventilation hose (*2).
Connect the hose band (*3).
![]() |
Connect the 3 vacuum hoses.
| 73. INSTALL AIR CLEANER INLET ASSEMBLY |
![]() |
Install the air cleaner inlet with the clamp and 2 bolts.
| 74. CONNECT VACUUM HOSES |

| 75. INSTALL V-RIBBED BELT |
![]() |
Install the V-ribbed belt.
Using SST, turn the belt tensioner counterclockwise and remove the bar.
![]() |
If it is difficult to install the V-ribbed belt, perform the following procedure:
Put the V-ribbed belt on every pulley except the tensioner pulley as shown in the illustration.
While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the tensioner pulley.
After installing the V-ribbed belt, check that it fits properly in the ribbed grooves. Confirm that the belt has not slipped out of the grooves on the bottom of the crank pulley by hand.
| 76. INSTALL COWL TOP PANEL OUTER SUB-ASSEMBLY |
![]() |
Install the cowl top panel outer sub-assembly with the 4 bolts and 4 nuts.
| 77. INSTALL WINDSHIELD WIPER LINK ASSEMBLY |
| 78. INSTALL FRONT WHEELS |
| 79. ADD ENGINE OIL |
| 80. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 81. ADD ENGINE COOLANT |
Close the radiator drain cock plug and 2 cylinder block drain cock plugs.
Slowly fill the radiator with TOYOTA Super Long Life Coolant (SLLC).
Slowly pour coolant into the radiator reservoir tank until it reaches the FULL line.
Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
If the coolant level is low, add coolant.
Install the radiator cap sub-assembly and reservoir tank cap.
Start the engine, and warm it up.
Stop the engine, and wait until the engine coolant cools down.
Add engine coolant to the FULL line on the radiator reservoir.
| 82. ADD AUTOMATIC TRANSAXLE FLUID |
| 83. ADD POWER STEERING FLUID |
| 84. BLEED POWER STEERING FLUID |
Check the fluid level .
Jack up the front of the vehicle and support it with stands.
Turn the steering wheel.
With the engine stopped, turn the steering wheel slowly from lock to lock several times.
Lower the vehicle.
Start the engine.
Run the engine at idle for a few minutes.
Turn the steering wheel.
With the engine idling, turn the steering wheel left or right to the full lock position and keep it in that position for 2 to 3 seconds, then turn the steering wheel to the opposite full lock position and keep it there for 2 to 3 seconds.
Repeat this procedure several times.
Stop the engine.
![]() |
Check for foaming or emulsification.
Check the fluid level .
| 85. CHECK FOR FUEL LEAKS |
Check fuel pump operation.
Connect the intelligent tester to the DLC3.
Turn the ignition switch to the ON position and push the intelligent tester main switch on.
Select the following menus: Powertrain / Engine / Active Test / Control the Fuel Pump /Speed.
Check for pressure in the fuel inlet tube from the fuel line. Check that sound of fuel flowing in the fuel tank can be heard. If no sound can be heard, check the integration relay, fuel pump, ECM and wiring connector.
Check for fuel leaks.
Check that there are no fuel leaks anywhere on the system after performing maintenance. If there is a fuel leak, repair or replace parts if necessary.
Turn the ignition switch off.
Disconnect the intelligent tester from the DLC3.
| 86. CHECK FOR ENGINE OIL LEAKS |
| 87. CHECK FOR ENGINE COOLANT LEAKS |
![]() |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using a radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf*cm, 17 psi), and check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and cylinder head.
| 88. CHECK FOR EXHAUST GAS LEAKS |
| 89. CHECK SHIFT LEVER POSITION |
When shifting from the P to the R position with the ignition switch on (IG) and the brake pedal depressed, make sure that the shift lever moves smoothly and moves correctly into the position.
Start the engine and make sure that the vehicle moves forward when shifting from the N to the D position and moves rearward when shifting to the R position. If operation cannot be done as specified, inspect the park/neutral position switch assembly and check the shift lever assembly installation condition.
| 90. CHECK AND ADJUST FRONT WHEEL ALIGNMENT |
| 91. CHECK IGNITION TIMING |
Warm up the engine.
![]() |
When using the intelligent tester:
Check the ignition timing.
Connect the intelligent tester to the DLC3.
Enter DATA LIST mode with the intelligent tester.
![]() |
When not using the intelligent tester:
Check the ignition timing.
Using SST, connect terminals 13 (TC) and 4 (CG) of the DLC3.
Remove the V-bank cover.
![]() |
Pull out the red lead wire harness.
Connect the tester terminal of the timing light to the red lead wire as shown in the illustration.
Check the ignition timing at idle.
Disconnect terminals 13 (TC) and 4 (CG) of the DLC3.
Check the ignition timing at idle.
Confirm that the ignition timing moves to the advanced angle side when the engine rpm is increased.
Remove the timing light.
| 92. CHECK ENGINE IDLE SPEED |
Warm up the engine.
![]() |
When using the intelligent tester:
Check the idle speed.
Connect the intelligent tester to the DLC3.
Enter DATA LIST mode with the intelligent tester.
![]() |
When not using the intelligent tester:
Check the idle speed.
Using SST, connect the tachometer test probe to terminal 9 (TAC) of the DLC3.
Check the idle speed.
| 93. CHECK CO/HC |
Start the engine.
Run the engine at 2,500 rpm for approximately 180 seconds.
Insert the CO/HC meter testing probe at least 40 cm (1.3 ft) into the tailpipe during idling.
Check CO/HC concentration at idle and/or 2,500 rpm.
Check A/F sensor and heated oxygen sensor operation.
See the table below for possible causes, and then inspect and repair.
| CO | HC | Problems | Causes |
| Normal | High | Rough idle |
|
| Low | High | Rough idle (fluctuating HC reading) |
|
| High | High | Rough idle (black smoke from exhaust) |
|
| 94. CHECK FUNCTION OF THROTTLE BODY |
![]() |
Inspect the throttle control motor for operating sounds.
Turn the ignition switch on (IG).
When turning the accelerator pedal position sensor lever, check for running sounds of the motor. The motor should be running smoothly without friction sounds.
If operation is not as specified, check the throttle control motor, wiring and ECM .
Inspect the throttle position sensor.
![]() |
Connect the intelligent tester to the DLC3.
Turn the ignition switch on (IG).
Check that the MIL is off.
Check that, under the CURRENT DATA, THROTTLE POS (throttle valve opening percentage) is within the standard range below.
| 95. INSTALL FRONT FENDER APRON SEAL RH |
| 96. INSTALL ENGINE UNDER COVER LH |
| 97. INSTALL ENGINE UNDER COVER RH |
| 98. INSTALL V-BANK COVER SUB-ASSEMBLY |
![]() |
Engage the 3 retainers to install the V-bank cover.
| 99. INSTALL COOL AIR INTAKE DUCT SEAL |
![]() |
Install the intake duct seal with the 7 clips.
| 100. CHECK ABS SPEED SENSOR SIGNAL |
ABS: Click here.
VSC: Click here.