Home › Engine / Hybrid System › 2AR-FE STARTING › STARTER
RM19V0EQ _51 Engine / Hybrid System _014580 2AR-FE STARTING _0073966 STARTER A

2AR-FE STARTING  STARTER  INSTALLATION  


PROCEDURE

Hide 28100 1.INSTALL STARTER ASSEMBLY

a.

Install the starter assembly with the 2 bolts.

Torque:
37 N*m (377 kgf*cm, 27 ft.*lbf)


b.

Connect the starter connector.


c.

Install the terminal nut and cover the nut with the cap.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


Hide 17701 3.INSTALL AIR CLEANER CASE SUB-ASSEMBLY

Hide 17801 4.INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

Hide 17735 5.INSTALL AIR CLEANER CAP SUB-ASSEMBLY

Hide 17750A 6.INSTALL INLET AIR CLEANER ASSEMBLY

Hide 12601B 7.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

Hide 8.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION