POWER STEERING SYSTEM (for 2GR-FE) > EPS Warning Light Circuit |

| 1.CHECK CONNECTOR CONNECTION CONDITION AND GROUND WIRE |
Check the connection condition of the ECU wire sub-assembly and power steering ECU assembly connectors.
Check that the ground wire is securely installed with the bolt .
|
| ||||
| OK | |
| 2.CHECK FOR DTC (CAN COMMUNICATION SYSTEM) |
Check for DTCs (Click here).
|
| ||||
| OK | |
| 3.CHECK HARNESS AND CONNECTOR (BATTERY - ECU WIRE SUB-ASSEMBLY) |
![]() |
Disconnect the Ij2 connector from the ECU wire sub-assembly.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| Ij2-5 (IG) - Body ground | Engine switch on (IG) | 9 to 16 V |
| *a | Front view of wire harness connector (to ECU Wire Sub-assembly) |
|
| ||||
| OK | |
| 4.CHECK ECU WIRE SUB-ASSEMBLY |
![]() |
Connect the Ij2 connector to the ECU wire sub-assembly.
Disconnect the power steering ECU assembly j3 and j2 connectors.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| j3-1 (IG) - Body ground | Engine switch on (IG) | 9 to 16 V |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| j2-2 (PGND) - Body ground | Always | Below 1 Ω |
| *a | Front view of wire harness connector (to Power Steering ECU Assembly) |
|
| ||||
| OK | |
| 5.PERFORM ACTIVE TEST USING TECHSTREAM |
Reconnect the power steering ECU assembly j3 and j2 connectors.
Perform the Active Test of the combination meter assembly using the Techstream (Click here).
Check the combination meter assembly.
|
| ||||
| OK | ||
| ||