Home › Vehicle Interior › THEFT DETERRENT / KEYLESS ENTRY › ENGINE IMMOBILISER SYSTEM (w/ Smart Key System)

DTC    B2799    Engine Immobiliser System Malfunction

for Preparation Click here


DESCRIPTION

When there are communication malfunctions between the ECM and certification ECU (smart key ECU assembly), or when the communication ID codes do not match, the ECM stores this DTC.

DTC Code
DTC Detection Condition
Trouble Area
DTC Output Confirmation Operation
B2799
Either condition is met (1 trip detection logic*):
  1. A malfunction in the communication or communication lines between the ECM and certification ECU (smart key ECU assembly).
  2. A matching communication code cannot be verified during communication between the ECM and certification ECU (smart key ECU assembly).
  1. Certification ECU (smart key ECU assembly)
  2. ECM
  3. Wire harness or connector
Either condition is met:
  1. Within 10 seconds of an engine start operation being performed (with the shift lever in P and the brake pedal depressed, the engine switch is pressed while carrying the key). If there is a malfunction, the engine stops (communication begins within 3 seconds of the engine start operation being performed, and DTCs are stored after 6 seconds).
  2. 10 seconds after the engine switch is turned on (IG) after reconnecting the cable to the negative (-) battery terminal (communication begins within 3 seconds of the engine switch being turned on (IG), and DTCs are stored after 6 seconds).
  1. *: Only output while a malfunction is present.

Vehicle Condition and Fail-safe Operation when Malfunction Detected 
Vehicle Condition when Malfunction Detected
Fail-safe Operation when Malfunction Detected
Engine cannot be started
-

Related Data List and Active Test 
DTC Code
Data List and Active Test
B2799
-

WIRING DIAGRAM


B271006E10


INSPECTION PROCEDURE

NOTICE:
  1. When replacing the certification ECU (smart key ECU assembly), refer to Registration (Click here).
  2. After performing repairs, perform the operation that fulfills the DTC output confirmation operation, and then confirm that no DTCs are output again.

HINT:
When DTC B2799 and the certification ECU (smart key ECU assembly) DTC are output simultaneously, first perform troubleshooting for the certification ECU (smart key ECU assembly) DTC.

1.CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - ECM)
  1. Disconnect the A43 certification ECU (smart key ECU assembly) connector.

  1. Disconnect the A25 ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    for 2GR-FE 
    Tester Connection
    Condition
    Specified Condition
    A43-14 (EFII) - A25-30 (IMO)
    Always
    Below 1 Ω
    A25-30 (IMO) - Body ground
    Always
    10 kΩ or higher
    A43-13 (EFIO) - A25-31 (IMI)
    Always
    Below 1 Ω
    A25-31 (IMI) - Body ground
    Always
    10 kΩ or higher
    for 2AR-FE 
    Tester Connection
    Condition
    Specified Condition
    A43-14 (EFII) - A25-29 (IMO)
    Always
    Below 1 Ω
    A25-29 (IMO) - Body ground
    Always
    10 kΩ or higher
    A43-13 (EFIO) - A25-28 (IMI)
    Always
    Below 1 Ω
    A25-28 (IMI) - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


2.REGISTER ECU COMMUNICATION ID
  1. Register the ECU communication ID (Click here).


NEXT


3.CLEAR DTC
  1. Clear the DTCs (Click here).


NEXT


4.CHECK DTC OUTPUT
  1. Check for DTCs (Click here).

    HINT:
    Before checking for DTCs, perform the "DTC Output Confirmation Operation" procedure.

    OK:
    DTC B2799 is not output.



NG
Go to step 5
OK

END (ECU COMMUNICATION ID HAS NOT BEEN REGISTERED) 

5.REPLACE ECM
  1. Temporarily replace the ECM with a new or known good one (Click here for 2GR-FE, Click here for 2AR-FE).


NEXT


6.CLEAR DTC
  1. Clear the DTCs (Click here).


NEXT


7.CHECK DTC OUTPUT
  1. Check for DTCs (Click here).

    HINT:
    Before checking for DTCs, perform the "DTC Output Confirmation Operation" procedure.

    OK:
    DTC B2799 is not output.



NG
REPLACE CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) (Click here)
OK

END (ECM WAS DEFECTIVE)