16331A
1.INSTALL THERMOSTAT
Install a new gasket to the thermostat.
| *1 | Jiggle Valve |
| *a | 10° |
Install the thermostat with the jiggle valve facing up.
The jiggle valve may be set within 10° on either side of the prescribed position.
16321
2.INSTALL WATER INLET
Install the water inlet with the 2 nuts .
16572D
3.CONNECT NO. 2 RADIATOR HOSE
16604
4.INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
16361A
5.INSTALL V-RIBBED BELT
6.ADD ENGINE COOLANT
7.INSPECT FOR COOLANT LEAK