The ABS main relay supplies power to the changeover solenoid and the linear solenoid.
The ABS main relay remains on for approximately 2 minutes after the power switch is turned off and the input of brake pedal operation signals stops, and supplies power to the system to keep it ready to operate.
| DTC No. | Detection Item | INF Code | DTC Detection Condition | Trouble Area | Note |
|---|---|---|---|---|---|
| C1311/11 | Open in Main Relay 1 Circuit | 1 | Either of the following is detected:
1.
When the power switch is on (READY): The ABS main relay contact is not turned ON (BS terminal voltage 3.5 V or more) for 0.2 seconds or more when the ABS main relay ON is requested while IG1 terminal voltage is 9.5 V or more. 2.
When the power switch is off: The ABS main relay contact is not turned ON (BS terminal voltage 3.5 V or more) for 0.2 seconds or more when the ABS main relay ON is requested. |
·
Open or short in ABS main relay circuit ·
Skid control ECU (Brake booster with master cylinder assembly) |
Electronically controlled brake system DTC |
| C1312/12 | Short in Main Relay 1 Circuit | 2 | The ABS main relay contact is turned ON (BS terminal voltage 3.5 V or more) for 4.5 seconds or more when the ABS main relay OFF is requested from the ECU. | ·
Short in ABS main relay circuit ·
ABS main relay internal stuck ·
Skid control ECU (Brake booster with master cylinder assembly) |
Electronically controlled brake system DTC |
Refer to DTCs C1241/41 and C1242/42.
Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>C1241/41
When replacing the skid control ECU (brake booster with master cylinder assembly), perform initialization and calibration of the linear solenoid valve.
Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>INITIALIZATION
Connect the intelligent tester to the DLC3.
Turn the power switch on (IG).
Select the Active Test on the intelligent tester.
| Tester Display | Measurement Item | Control Range | Diagnostic Note |
|---|---|---|---|
| ECB Main Relay | ABS main relay | Relay ON/OFF | ECB: Electronically Controlled Brake System |
| Tester Display |
|---|
| ECB Main Relay |
Select the Data List on the intelligent tester.
| Tester Display | Measurement Item | Range | Normal Condition | Diagnostic Note |
|---|---|---|---|---|
| ECB Main Relay | ABS main relay | ON or OFF | ON: Relay on
OFF: Relay off |
ECB: Electronically Controlled Brake System |
| Tester Display |
|---|
| ECB Main Relay |
Check that the condition of the ABS main relay observed on the intelligent tester changes according to tester operation.
| Result | Proceed to |
|---|---|
| ABS main relay in the Data List turns ON/OFF using the Active Test. | A |
| ABS main relay in the Data List does not change using the Active Test. | B |
A
B
| *a | Front view of wire harness connector
(to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
Turn the power switch off.
Make sure that there is no looseness at the locking part and the connecting part of the connector.
Disconnect the A28 skid control ECU (brake booster with master cylinder assembly) connector.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A28-15 (BS) - Body ground | Always | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Reconnect the A28 skid control ECU (brake booster with master cylinder assembly) connector.
Clear the DTCs.
Turn the power switch on (IG).
Check if the same DTC is output.
| Result | Proceed to |
|---|---|
| DTCs C1311/11 and C1312/12 are not output. | A |
| DTCs C1311/11 and/or C1312/12 are output. | B |
A
Click hereGeneral>INTRODUCTION>HOW TO TROUBLESHOOT ECU CONTROLLED SYSTEMS>HOW TO PROCEED WITH TROUBLESHOOTING
B
| *a | Front view of wire harness connector
(to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
Turn the power switch off.
Check that the ABS NO. 1 (30 A) and ABS NO. 2 (7.5 A) fuses are normal.
If the result is not as specified, replace the ABS NO. 1 fuse (fusible link block assembly) and/or ABS NO. 2 fuse.
Make sure that there is no looseness at the locking part and the connecting part of the connector.
Disconnect the A28 skid control ECU (brake booster with master cylinder assembly) connector.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A28-14 (BI) - Body ground | Always | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
| *a | Front view of wire harness connector
(to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A28-15 (BS) - Body ground | Always | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG