Home › Brake › BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS › ELECTRONICALLY CONTROLLED BRAKE SYSTEM
RM2040EQ _54 Brake _014708 BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS _0074978 ELECTRONICALLY CONTROLLED BRAKE SYSTEM C

BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS  ELECTRONICALLY CONTROLLED BRAKE SYSTEM  C1311/11  Open in Main Relay 1 Circuit  C1312/12  Short in Main Relay 1 Circuit  


DESCRIPTION

The ABS main relay supplies power to the changeover solenoid and the linear solenoid.

The ABS main relay remains on for approximately 2 minutes after the power switch is turned off and the input of brake pedal operation signals stops, and supplies power to the system to keep it ready to operate.

DTC No. Detection Item INF Code DTC Detection Condition Trouble Area Note
C1311/11 Open in Main Relay 1 Circuit 1 Either of the following is detected:
1.

When the power switch is on (READY):

The ABS main relay contact is not turned ON (BS terminal voltage 3.5 V or more) for 0.2 seconds or more when the ABS main relay ON is requested while IG1 terminal voltage is 9.5 V or more.

2.

When the power switch is off:

The ABS main relay contact is not turned ON (BS terminal voltage 3.5 V or more) for 0.2 seconds or more when the ABS main relay ON is requested.


·

Open or short in ABS main relay circuit

·

Skid control ECU (Brake booster with master cylinder assembly)


Electronically controlled brake system DTC
C1312/12 Short in Main Relay 1 Circuit 2 The ABS main relay contact is turned ON (BS terminal voltage 3.5 V or more) for 4.5 seconds or more when the ABS main relay OFF is requested from the ECU.
·

Short in ABS main relay circuit

·

ABS main relay internal stuck

·

Skid control ECU (Brake booster with master cylinder assembly)


Electronically controlled brake system DTC

WIRING DIAGRAM

CAUTION / NOTICE / HINT

NOTICE:

When replacing the skid control ECU (brake booster with master cylinder assembly), perform initialization and calibration of the linear solenoid valve.

Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>INITIALIZATION


PROCEDURE

1.PERFORM ACTIVE TEST USING INTELLIGENT TESTER (ABS MAIN RELAY)
a.

Connect the intelligent tester to the DLC3.


b.

Turn the power switch on (IG).


c.

Select the Active Test on the intelligent tester.

Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>DATA LIST / ACTIVE TEST

Chassis > ABS/VSC/TRC > Active Test
Tester Display Measurement Item Control Range Diagnostic Note
ECB Main Relay ABS main relay Relay ON/OFF ECB: Electronically Controlled Brake System
Chassis > ABS/VSC/TRC > Active Test
Tester Display
ECB Main Relay
50004 105 37

d.

Select the Data List on the intelligent tester.

Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>DATA LIST / ACTIVE TEST

Chassis > ABS/VSC/TRC > Data List
Tester Display Measurement Item Range Normal Condition Diagnostic Note
ECB Main Relay ABS main relay ON or OFF ON: Relay on
OFF: Relay off
ECB: Electronically Controlled Brake System
Chassis > ABS/VSC/TRC > Data List
Tester Display
ECB Main Relay
50003 105 65

e.

Check that the condition of the ABS main relay observed on the intelligent tester changes according to tester operation.


Result:
Result Proceed to
ABS main relay in the Data List turns ON/OFF using the Active Test. A
ABS main relay in the Data List does not change using the Active Test. B



A

2.CHECK HARNESS AND CONNECTOR (BS TERMINAL)

B

4.CHECK HARNESS AND CONNECTOR (BI TERMINAL)
2.CHECK HARNESS AND CONNECTOR (BS TERMINAL)
a.
C249762C45
0.208,0.802 0.625,1.073 0.417,0.271 2.646,1.854 2.865,2.896 false 0.198,0.188 0.823,0.583 0.625,0.396 10 false *a 0.292,0.854 0.979,1.167 0.688,0.313 10 false A28 2.813,2.948 3.417,3.427 0.604,0.479 10 false BS
*a Front view of wire harness connector
(to Skid Control ECU (Brake Booster with Master Cylinder Assembly))


Turn the power switch off.


b.

Make sure that there is no looseness at the locking part and the connecting part of the connector.


c.

Disconnect the A28 skid control ECU (brake booster with master cylinder assembly) connector.


d.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
A28-15 (BS) - Body ground Always 11 to 14 V



Result:
Proceed to
OK
NG



OK

3.RECONFIRM DTC

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR (BS CIRCUIT)

3.RECONFIRM DTC
a.

Reconnect the A28 skid control ECU (brake booster with master cylinder assembly) connector.


b.

Clear the DTCs.

Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>DTC CHECK / CLEAR

Chassis > ABS/VSC/TRC > Clear DTCs
50002 105

c.

Turn the power switch on (IG).


d.

Check if the same DTC is output.

Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>DTC CHECK / CLEAR

Chassis > ABS/VSC/TRC > Trouble Codes
50001 105

Result:
Result Proceed to
DTCs C1311/11 and C1312/12 are not output. A
DTCs C1311/11 and/or C1312/12 are output. B



A

B

REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY

4.CHECK HARNESS AND CONNECTOR (BI TERMINAL)
a.
C249762C46
0.208,0.802 0.625,1.073 0.417,0.271 2.458,1.74 2.906,2.938 false 0.198,0.188 0.385,0.344 0.188,0.156 10 false *a 0.292,0.854 0.719,1.167 0.427,0.313 10 false A28 2.885,3.01 3.323,3.344 0.438,0.333 10 false BI
*a Front view of wire harness connector
(to Skid Control ECU (Brake Booster with Master Cylinder Assembly))


Turn the power switch off.


b.

Check that the ABS NO. 1 (30 A) and ABS NO. 2 (7.5 A) fuses are normal.

HINT:

If the result is not as specified, replace the ABS NO. 1 fuse (fusible link block assembly) and/or ABS NO. 2 fuse.



c.

Make sure that there is no looseness at the locking part and the connecting part of the connector.


d.

Disconnect the A28 skid control ECU (brake booster with master cylinder assembly) connector.


e.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
A28-14 (BI) - Body ground Always 11 to 14 V



Result:
Proceed to
OK
NG



OK

5.CHECK HARNESS AND CONNECTOR (BS TERMINAL)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR (BI CIRCUIT)

5.CHECK HARNESS AND CONNECTOR (BS TERMINAL)
a.
C249762C47
0.208,0.802 0.625,1.073 0.417,0.271 2.604,1.854 2.906,2.938 false 0.198,0.188 0.385,0.344 0.188,0.156 10 false *a 0.302,0.854 0.729,1.167 0.427,0.313 10 false A28 2.885,3.01 3.323,3.344 0.438,0.333 10 false BS
*a Front view of wire harness connector
(to Skid Control ECU (Brake Booster with Master Cylinder Assembly))


Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
A28-15 (BS) - Body ground Always 11 to 14 V



Result:
Proceed to
OK
NG



OK

REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR (BS CIRCUIT)