SFI SYSTEM (w/ EGR System) > Fuel Pump Control Circuit |

| 1.PERFORM ACTIVE TEST USING GTS (CONTROL THE FUEL PUMP / SPEED) |
Connect the GTS to the DLC3.
Turn the power switch on (IG).
Turn the GTS on.
Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.
Check whether the fuel pump operating sound occurs when performing the Active Test on the GTS.
| Result | Proceed to |
| Fuel pump operating sound does not occur | A |
| Fuel pump operating sound occurs | B |
|
| ||||
| A | |
| 2.INSPECT C/OPN RELAY |
Inspect the C/OPN relay (Click here).
|
| ||||
| OK | |
| 3.CHECK HARNESS AND CONNECTOR (ECM - C/OPN RELAY) |
Disconnect the ECM connector.
Remove the C/OPN relay from the engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A25-21 (FC) - C/OPN relay terminal 2 | Always | Below 1 Ω |
| A25-21 (FC) or C/OPN relay terminal 2 - Body ground | Always | 10 kΩ or higher |
|
| ||||
| OK | |
| 4.CHECK HARNESS AND CONNECTOR (C/OPN RELAY - NO. 1 INTEGRATION RELAY) |
Remove the C/OPN relay from the engine room relay block and junction block assembly.
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| C/OPN relay terminal 1 - 1C-5 | Always | Below 1 Ω |
| C/OPN relay terminal 5 - 1C-6 | Always | Below 1 Ω |
| C/OPN relay terminal 1 or 1C-5 - Body ground | Always | 10 kΩ or higher |
| C/OPN relay terminal 5 or 1C-6 - Body ground | Always | 10 kΩ or higher |
|
| ||||
| OK | |
| 5.CHECK HARNESS AND CONNECTOR (C/OPN RELAY - FUEL PUMP) |
Remove the C/OPN relay from the engine room relay block and junction block assembly.
Disconnect the fuel pump connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| C/OPN relay terminal 3 - N11-4 (B) | Always | Below 1 Ω |
| C/OPN relay terminal 3 or N11-4 (B) - Body ground | Always | 10 kΩ or higher |
|
| ||||
| OK | |
| 6.CHECK HARNESS AND CONNECTOR (FUEL PUMP - BODY GROUND) |
Disconnect the fuel pump connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| N11-5 (E) - Body ground | Always | Below 1 Ω |
|
| ||||
| OK | |
| 7.INSPECT FUEL PUMP |
Inspect the fuel pump (Click here).
|
| ||||
| OK | |
| 8.INSPECT NO. 1 INTEGRATION RELAY |
Inspect the No. 1 integration relay (Click here).
|
| ||||
| OK | |
| 9.CHECK TERMINAL VOLTAGE (POWER SOURCE OF NO. 1 INTEGRATION RELAY) |
![]() |
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1D-1 - Body ground | Always | 11 to 14 V |
| *a | Front view of wire harness connector (to No. 1 Integration Relay) |
|
| ||||
| OK | ||
| ||
| 10.READ VALUE USING GTS (STARTER SIGNAL) |
Connect the GTS to the DLC3.
Turn the power switch on (IG).
Turn the GTS on.
Put the engine in inspection mode (maintenance mode) (Click here).
Enter the following menus: Powertrain / Engine and ECT / Data List / Primary / Starter Signal.
Check the result when the power switch on (IG) and the engine starts.
| Condition | Starter Signal |
| Power switch on (IG) | OFF |
| Engine started | ON |
|
| ||||
| OK | |
| 11.READ VALUE USING GTS (ENGINE SPEED) |
Connect the GTS to the DLC3.
Turn the power switch on (IG).
Turn the GTS on.
Put the engine in inspection mode (maintenance mode) (Click here).
Enter the following menus: Powertrain / Engine and ECT / Data List / Primary / Engine Speed.
Read the values displayed on the GTS while cranking.
|
| ||||
| OK | ||
| ||