Home › Steering › POWER ASSIST SYSTEMS › POWER STEERING SYSTEM

POWER STEERING SYSTEM > EPS Warning Light Circuit

for Preparation Click here


DESCRIPTION

If the power steering ECU assembly detects a malfunction, the EPS warning light comes on. At this time, the power steering ECU assembly stores a DTC in its memory.

WIRING DIAGRAM


C250102E11


INSPECTION PROCEDURE

NOTICE:
If the power steering ECU assembly has been replaced, perform assist map writing (Click here).

HINT:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.

1.CHECK CONNECTOR CONNECTION CONDITION AND GROUND WIRE
  1. Check the connection condition of the ECU wire sub-assembly and power steering ECU assembly connectors.

    OK:
    The ECU wire sub-assembly and power steering ECU assembly connectors are securely connected.

  1. Check that the ground wire is securely installed with the bolt (Click here).

    OK:
    The ground wire is securely installed with the bolt.



NG
CONNECT CONNECTOR OR INSTALL GROUND WIRE (Click here)
OK


2.CHECK FOR DTC (CAN COMMUNICATION SYSTEM)
  1. Check for DTCs (Click here).

    OK:
    DTC is not output.



NG
GO TO CAN COMMUNICATION SYSTEM (Click here)
OK


3.CHECK HARNESS AND CONNECTOR (AUXILIARY BATTERY - ECU WIRE SUB-ASSEMBLY)


    C240359E02
  1. Disconnect the Ij2 connector from the ECU wire sub-assembly.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    Ij2-5 (IG) - Body ground
    Power switch on (IG)
    9 to 16 V

Text in Illustration 
*a
Front view of wire harness connector
(to ECU Wire Sub-assembly)


NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


4.CHECK ECU WIRE SUB-ASSEMBLY


    C240351E02
  1. Connect the Ij2 connector to the ECU wire sub-assembly.

  1. Disconnect the power steering ECU assembly j3 and j2 connectors.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    j3-1 (IG) - Body ground
    Power switch on (IG)
    9 to 16 V

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    j2-2 (PGND) - Body ground
    Always
    Below 1 Ω

Text in Illustration 
*a
Front view of wire harness connector
(to Power Steering ECU Assembly)


NG
REPAIR OR REPLACE ECU WIRE SUB-ASSEMBLY
OK


5.INSPECT COMBINATION METER ASSEMBLY
  1. Reconnect the power steering ECU assembly connector.

  1. Perform the Active Test of the combination meter assembly using the intelligent tester (Click here).

  1. Check the combination meter assembly.

    OK:
    The EPS warning light turns on or off in accordance with the intelligent tester operation.

    HINT:
    If troubleshooting has been carried out according to Problem Symptoms Table, refer back to the table and proceed to the next step before replacing the part (Click here).



NG
REPLACE COMBINATION METER ASSEMBLY (Click here)
OK

REPLACE POWER STEERING ECU ASSEMBLY (Click here)