Home › Power Source / Network › 6AR-FSE (BATTERY / CHARGING) › GENERATOR › 2018.04–2021.02
RM33A0E _57 Power Source / Network _072212 6AR-FSE BATTERY / CHARGING _0351554 GENERATOR A

6AR-FSE BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Install the generator assembly with the 2 bolts.

Torque:
52 N*m (530 kgf*cm, 38 ft.*lbf)


b.

Install the wire harness clamp bracket with the bolt to the generator assembly.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


c.

Connect the 4 wire harness clamps.


d.

Connect the engine oil pressure switch assembly connector.


e.

Connect the generator assembly connector.


f.

Connect the wire harness to terminal B with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


g.

Install the terminal cap.


Hide 2.INSTALL V-RIBBED BELT

Hide 17750A 3.INSTALL INLET AIR CLEANER ASSEMBLY

Hide 53295E 4.INSTALL COOL AIR INTAKE DUCT SEAL

Hide 5.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION