The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during generator assembly removal/installation are shown below.
1. PRECAUTION
After turning the engine switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) battery terminal notices before proceeding with work.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
2.DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION
16400
3.REMOVE RADIATOR ASSEMBLY
11209
4.REMOVE V-BANK COVER SUB-ASSEMBLY
16361A
5.REMOVE V-RIBBED BELT
27020
6.REMOVE GENERATOR ASSEMBLY
Open the terminal cap.
Remove the nut and disconnect the wire harness from terminal B.
Remove the 2 bolts.
Disconnect the generator assembly connector.
Disconnect the compressor assembly with magnetic clutch connector.
Disconnect the camshaft timing oil control solenoid assembly connector.
Disengage the 3 wire harness clamps and remove the wire harness clamp bracket.
Remove the 2 bolts and generator assembly bracket.
Remove the 2 bolts and generator assembly.