Home › Engine / Hybrid System › HYBRID / BATTERY CONTROL › FUSE BOX
RM33C0E _51 Engine / Hybrid System _065433 HYBRID / BATTERY CONTROL _0328999 FUSE BOX A

HYBRID / BATTERY CONTROL  FUSE BOX  INSTALLATION  


PROCEDURE

Hide G92Z2 1.INSTALL HYBRID BATTERY TERMINAL BLOCK

CAUTION:

Be sure to wear insulated gloves and protective goggles.


a.

Connect the 2 hybrid battery terminal block connectors.

NOTICE:

Make sure that the connectors are connected securely.



b.
A406151C01
1.01,0.646 2.052,0.646 true 0.833,0.542 1.146,0.698 0.313,0.156 10 false *a
*a Pin


Install the hybrid battery terminal block to the HV battery with the bolt.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)

NOTICE:

Make sure to align the hole of the hybrid battery terminal block with the pin.



Hide G92Q1 2.INSTALL NO. 1 HV BATTERY SHIELD PANEL

Hide G920NB 3.INSTALL UPPER HV BATTERY COVER SUB-ASSEMBLY