Home › Engine / Hybrid System › A25A-FXS (ENGINE CONTROL) › ECM › from 2019.10
RM33C0E _51 Engine / Hybrid System _065419 A25A-FXS ENGINE CONTROL _0326945 ECM A

A25A-FXS ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 89668 1.INSTALL NO. 2 ECM BRACKET

a.

Install the No. 2 ECM bracket to the ECM with the 2 screws.

Torque:
4.5 N*m (46 kgf*cm, 40 in.*lbf)


Hide 89667E 2.INSTALL NO. 1 ECM BRACKET

a.

Install the No. 1 ECM bracket to the ECM with the 2 screws.

Torque:
4.5 N*m (46 kgf*cm, 40 in.*lbf)


Hide 89661 3.INSTALL ECM

a.

for LHD:

i.
A406022N01
2.74,1.281 2.896,1.479 0.156,0.198 10 true 1 2.396,0.865 2.552,1.063 0.156,0.198 10 true 2

Install the ECM with the 2 nuts in the order shown in the illustration.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)

NOTICE:

If the ECM has been struck or dropped, replace it.



ii.
A406020

Engage the clamp.


iii.

Install the engine wire to the No. 2 ECM bracket with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


iv.

Connect the 2 ECM connectors and rotate the 2 levers to lock them.

NOTICE:
·

When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water and other foreign matter.

·

Be sure to securely connect the ECM connectors.





b.

for RHD:

i.
A406021N01
2.76,1.25 2.917,1.448 0.156,0.198 10 true 1 2.417,0.823 2.573,1.021 0.156,0.198 10 true 2

Install the ECM with the 2 nuts in the order shown in the illustration.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)

NOTICE:

If the ECM has been struck or dropped, replace it.



ii.
A406019

Engage the 2 clamps.


iii.

Install the engine wire to the No. 2 ECM bracket with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


iv.

Connect the 2 ECM connectors and rotate the 2 levers to lock them.

NOTICE:
·

When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water and other foreign matter.

·

Be sure to securely connect the ECM connectors.





Hide 4.CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

Hide 64718C 5.INSTALL LUGGAGE TRIM SERVICE HOLE COVER

Hide 7. GPF DEPOSITION VALUES

NOTICE:

Before replacing the ECM, store the volumes of accumulated ash (metal oxide) and PM (Particulate Matter). After replacing the ECM, write the volumes of accumulated ash and PM to the new ECM. (w/ Differential Pressure Sensor)

Click hereEngine / Hybrid System>A25A-FXS (ENGINE CONTROL)>SFI SYSTEM (w/o Canister Pump Module)>REGISTRATION