17410
1.INSTALL FRONT EXHAUST PIPE ASSEMBLY
Using a vernier caliper, measure the free length of the compression spring.
41.5 mm (1.634 in.)
If the length is not as specified, replace the compression spring.
Using a plastic hammer and a wooden block, tap in a new exhaust pipe gasket until its surface is flush with the exhaust manifold.
Install the exhaust pipe gasket in the correct direction.
Do not damage the outer surface of the exhaust pipe gasket.
Do not reuse the exhaust pipe gasket.
Do not push in the gasket with the exhaust pipe when connecting it.
Install the front exhaust pipe assembly with the 2 compression springs and 2 bolts.
43 N*m (438 kgf*cm, 32 ft.*lbf)
89467B
2.INSTALL AIR FUEL RATIO SENSOR
17460
3.INSTALL CATALYTIC WITH PIPE CONVERTER ASSEMBLY
Install a new gasket onto the front exhaust pipe assembly.
Install the catalytic with pipe converter assembly with the 2 new nuts.(*2)
19 N*m (194 kgf*cm, 14 ft.*lbf) for nut
Tighten the 2 bolts and 2 new nuts.(*1)
43 N*m (438 kgf*cm, 32 ft.*lbf) for bolt
89465
4.INSTALL HEATED OXYGEN SENSOR
17420
5.INSTALL CENTER EXHAUST PIPE ASSEMBLY
For rear exhaust type
Using a vernier caliper, measure the free length of the compression spring.
41.5 mm (1.634 in.)
If the length is not as specified, replace the compression spring.
Install a new gasket onto the catalytic with pipe converter assembly.
Install the center exhaust pipe assembly with the 4 new nuts.(*2)
19 N*m (194 kgf*cm, 14 ft.*lbf) for nut
Tighten the 2 bolts and 2 compression springs.(*1)
43 N*m (438 kgf*cm, 32 ft.*lbf) for bolt
For side exhaust type
Install a new gasket onto the front exhaust pipe assembly.
Install the center exhaust pipe assembly with the 2 new nuts.(*2)
19 N*m (194 kgf*cm, 14 ft.*lbf) for nut
Tighten the 2 bolts and 2 new nuts.(*1)
43 N*m (438 kgf*cm, 32 ft.*lbf) for bolt
17420K
6.INSTALL NO. 2 CENTER EXHAUST PIPE ASSEMBLY
Using a vernier caliper, measure the free length of the compression spring.
41.5 mm (1.634 in.)
If the length is not as specified, replace the compression spring.
Install a new gasket onto the center exhaust pipe assembly.
Install the No. 2 center exhaust pipe assembly with the 4 new nuts.
19 N*m (194 kgf*cm, 14 ft.*lbf) for nut
Tighten the 2 bolts and 2 compression springs.
43 N*m (438 kgf*cm, 32 ft.*lbf) for bolt
17420
7.INSTALL INTERMEDIATE EXHAUST PIPE ASSEMBLY
Install a new gasket onto the center exhaust pipe assembly.
Install the intermediate exhaust pipe assembly with the 2 new nuts and the bolt.
19 N*m (194 kgf*cm, 14 ft.*lbf) for nut
43 N*m (438 kgf*cm, 32 ft.*lbf) for bolt
Tighten the 2 bolts and 2 new nuts.
43 N*m (438 kgf*cm, 32 ft.*lbf) for bolt
17430
8.INSTALL TAIL EXHAUST PIPE ASSEMBLY
Install a new gasket onto the center exhaust pipe assembly.
Install the tail exhaust pipe assembly with the bolt.
23 N*m (234 kgf*cm, 17 ft.*lbf) for nut
Tighten the 2 bolts and 2 nuts.
43 N*m (438 kgf*cm, 32 ft.*lbf) for bolt
17430
9.INSTALL NO. 2 TAIL EXHAUST PIPE ASSEMBLY
Install a new gasket onto the intermediate exhaust pipe assembly.
Install the tail exhaust pipe assembly with the bolt.
23 N*m (234 kgf*cm, 17 ft.*lbf) for nut
Tighten the 2 bolts and 2 nuts.
43 N*m (438 kgf*cm, 32 ft.*lbf) for bolt
10.INSPECT RUNOUT OF FOR EXHAUST GAS LEAK