Home › Engine / Hybrid System › 2TR-FE (ENGINE CONTROL) › THROTTLE BODY
RM2850E _51 Engine / Hybrid System _073287 2TR-FE ENGINE CONTROL _0356938 THROTTLE BODY A

2TR-FE ENGINE CONTROL  THROTTLE BODY  INSTALLATION  


PROCEDURE

Hide 22030 1.INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY

a.

Install a new gasket onto the intake manifold.

HINT:

Fit the gasket into the cutout of the intake manifold.



b.

Install the throttle with motor body assembly with the 4 bolts.

Torque:

10 N*m (102 kgf*cm , 7 ft.*lbf)



c.

Connect the water by-pass hose.


d.

Connect the No. 2 water by-pass hose.


e.

Connect the throttle with motor body assembly connector.


Hide 17861 2.INSTALL INTAKE AIR CONNECTOR

a.
A147695E02
0.313,2.125 0.51,2.333 0.198,0.208 10 true A 2.958,2.188 3.188,2.385 0.229,0.198 10 true B

Temporarily install the intake air connector onto the throttle with motor body assembly.


b.

Connect the No. 2 ventilation hose and vacuum hose.


c.

Install the intake air connector with the 2 bolts.

Torque:

8.0 N*m (82 kgf*cm , 71in.*lbf)



d.

Tighten the 2 hose clamp bolts.

Torque:

5.0 N*m (51kgf*cm , 44in.*lbf) for bolt A

4.8 N*m (49kgf*cm , 42in.*lbf) for bolt B



Hide 4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:

5.4 N*m (55kgf*cm , 48in.*lbf)


Hide 58701A 6.INSTALL FRONT ENGINE SERVICE COVER PANEL SUB-ASSEMBLY

Hide 33506F 7.INSTALL FLOOR SHIFT CONTROL SHIFT LEVER RETAINER SUB-ASSEMBLY

Hide 58123A 8.INSTALL SHIFT AND SELECT LEVER SUPPORT WITH BOOTS

Hide 58420 9.INSTALL NO. 2 ENGINE SERVICE HOLE COVER ASSEMBLY

Hide 58521D 10.INSTALL ENGINE SERVICE HOLE COVER MAT

Hide 58734B 11.INSTALL REAR ENGINE SERVICE COVER WEATHERSTRIP

Hide 58410 12.INSTALL ENGINE SERVICE HOLE COVER