26100
1.INSTALL DIESEL THROTTLE BODY
Remove any seal packing material from the contact surface.
Apply a continuous bead of seal packing (width: 1.5 to 2.5 mm (0.0591 to 0.0984 in.)) as shown in the illustration.
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
| *a | 70 mm (2.75 in.) |
| *b | Seal Packing |
Remove any oil from contact surface.
Install the diesel throttle body within 20 minutes of applying the seal packing.
Do not run the engine for at least 2 hours after installation.
Install the diesel throttle body with the 2 bolts and 2 nuts.
28.5 N*m (291 kgf*cm, 21 ft.*lbf)
Connect the 2 connectors.
17030
2.INSTALL AIR HOSE ASSEMBLY
| *a | Upper Side |
| *b | LH Side |
Connect the air hose assembly and install the bolt.
18 N*m (184 kgf*cm, 13 ft.*lbf)
Tighten the hose clamp (intercooler air hose side), as shown in the illustration.
6.0 N*m (61 kgf*cm, 53 in.*lbf)
Tighten the screw at a rate of 2 seconds per turn.
Tighten the hose clamp (diesel throttle body side).
Do not remove the hose clamp A.
Connect the 2 clamps.
11409
3.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
44379A
4.INSTALL NO. 2 OIL RESERVOIR BRACKET
44360
5.INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY
53712C
6.INSTALL FRONT FENDER APRON LH
51441D
7.INSTALL NO. 1 ENGINE UNDER COVER
58701A
8.INSTALL FRONT ENGINE SERVICE COVER PANEL SUB-ASSEMBLY
33820B
9.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
58841A
10.INSTALL SHIFTING HOLE COVER
58420
11.INSTALL NO. 2 ENGINE SERVICE HOLE COVER ASSEMBLY
58734B
12.INSTALL REAR ENGINE SERVICE COVER WEATHERSTRIP
58410
13.INSTALL ENGINE SERVICE HOLE COVER
58521D
14.INSTALL ENGINE SERVICE HOLE COVER MAT
15. PERFORM INITIALIZATION