Home › Engine / Hybrid System › N04C-VJ (EMISSION CONTROL) › EGR COOLER › from 2021.01
RM2850E _51 Engine / Hybrid System _096890 N04C-VJ EMISSION CONTROL _0461593 EGR COOLER A

N04C-VJ EMISSION CONTROL  EGR COOLER  INSTALLATION  


PROCEDURE

Hide 17505G 1.INSTALL NO. 1 EXHAUST PIPE HEAT INSULATOR SUB-ASSEMBLY

a.

Install the No. 1 exhaust pipe heat insulator sub-assembly with the 3 bolts.

Torque:
28.5 N*m (291 kgf*cm, 21 ft.*lbf)


Hide 25608 2.INSTALL EGR COOLER SUB-ASSEMBLY

a.
A477917N01
0.969,0.031 1.104,0.208 0.135,0.177 10 false A 1.448,1.125 1.604,1.323 0.156,0.198 10 true A 2.219,4.104 2.375,4.302 0.156,0.198 10 true B 1.021,4.01 1.167,4.167 0.146,0.156 10 true B

Connect the No. 1 water by-pass hose and No. 2 water by-pass hose.


b.

Connect the water by-pass hose and reserve tank hose.


c.

Install a new gasket and the EGR cooler sub-assembly with the 4 bolts.

Torque:
for bolt A : 55 N*m (561 kgf*cm, 41 ft.*lbf)
for bolt B : 68.5 N*m (699 kgf*cm, 51 ft.*lbf)


d.

Temporarily install the EGR pipe connector to the EGR cooler sub-assembly and exhaust manifold with the 2 new gaskets, 3 spacers, 3 nuts and 2 bolts.

NOTICE:

Tighten the nuts until they contact the EGR cooler sub-assembly.



e.
A260799

Tighten the 3 nuts.

Torque:
68.5 N*m (699 kgf*cm, 51 ft.*lbf)


f.
A255749

Tighten the 2 bolts.

Torque:
68.5 N*m (699 kgf*cm, 51 ft.*lbf)


Hide 17505H 3.INSTALL NO. 2 EXHAUST PIPE HEAT INSULATOR SUB-ASSEMBLY

a.

Install the No. 2 exhaust pipe heat insulator sub-assembly with the 2 bolts.

Torque:
28.5 N*m (291 kgf*cm, 21 ft.*lbf)


Hide 4.INSTALL NO. 2 TURBO INSULATOR

a.

Install the No. 2 turbo insulator with the 3 bolts.

Torque:
28.5 N*m (291 kgf*cm, 21 ft.*lbf)


Hide 5.INSTALL NO. 3 TURBO INSULATOR

a.

Install the No. 3 turbo insulator with the 4 bolts.

Torque:
28.5 N*m (291 kgf*cm, 21 ft.*lbf)


Hide 11409 6.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

a.

Install a new O-ring to the engine oil level dipstick guide.


b.

Install the engine oil level dipstick guide with the bolt.

Torque:
28.5 N*m (291 kgf*cm, 21 ft.*lbf)


c.

Attach the 2 wire harness clamps.


Hide 12203 7.INSTALL PCV PIPE SUB-ASSEMBLY

a.

Install the pcv pipe sub-assembly with the 2 bolts.

Torque:
28.5 N*m (291 kgf*cm, 21 ft.*lbf)


b.

Connect the No. 2 pcv hose and slide the clip to secure it.


c.

Connect the pcv hose and slide the 2 clips to secure it.


Hide 44379A 8.INSTALL NO. 2 OIL RESERVOIR BRACKET

a.

Install the No. 2 oil reservoir bracket with the 3 bolts.

Torque:
12 N*m (122 kgf*cm, 9 ft.*lbf)


Hide 44360 9.INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY

a.

Install the vane pump oil reservoir assembly with the 3 bolts.

Torque:
18 N*m (184 kgf*cm, 13 ft.*lbf)


Hide 12601B 10.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

Hide 17341F 11.INSTALL NO. 1 AIR HOSE

a.

Install the No. 1 air hose to the turbo charger sub-assembly and tighten the hose clamp.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


b.

Install the No. 1 air hose with the bolt.

Torque:
18 N*m (184 kgf*cm, 13 ft.*lbf)


c.

Connect the No. 3 pcv hose with the hose clamp.


d.

Attach the 4 wire harness clamps to the No. 1 air hose.


Hide 17113D 13.INSTALL INTAKE PIPE

a.
A447446

Install a new gasket and the intake pipe with the 2 nuts and bolt.

Torque:
28.5 N*m (291 kgf*cm, 21 ft.*lbf)


b.

Connect the No. 1 intercooler air hose with the clamp.

Torque:
6.0 N*m (61 kgf*cm, 53 in.*lbf)


Hide 16.INSPECT FOR COOLANT LEAK

Hide 17.INSPECT FOR EXHAUST GAS LEAK

Hide 58701A 18.INSTALL FRONT ENGINE SERVICE COVER PANEL SUB-ASSEMBLY

Hide 33820B 19.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY

Hide 58420 21.INSTALL NO. 2 ENGINE SERVICE HOLE COVER ASSEMBLY

Hide 58734B 22.INSTALL REAR ENGINE SERVICE COVER WEATHERSTRIP

Hide 58410 23.INSTALL ENGINE SERVICE HOLE COVER

Hide 58521D 24.INSTALL ENGINE SERVICE HOLE COVER MAT