Home › Engine / Hybrid System › 2GR-FE EMISSION CONTROL › HEATED OXYGEN SENSOR
RM24M0E _51 Engine / Hybrid System _059544 2GR-FE EMISSION CONTROL _0291812 HEATED OXYGEN SENSOR A

2GR-FE EMISSION CONTROL  HEATED OXYGEN SENSOR  INSTALLATION  


PROCEDURE

Hide 89465A 1.INSTALL HEATED OXYGEN SENSOR (for Bank 2 Sensor 2)

a.
A135144E01
0.22,0.581 0.523,0.743 0.302,0.162 10 SST 1.191,0.671 0.589,0.671 false

Using SST, install the heated oxygen sensor to the front exhaust pipe.

SST
09224-00010  

Torque:
40 N*m (408 kgf*cm, 30 ft.*lbf)

for use with SST

44 N*m (449 kgf*cm, 32 ft.*lbf)

for use without SST


HINT:
·

Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).

·

Make sure that SST and wrench are connected in a straight line.




Hide 17410 2.INSTALL FRONT EXHAUST PIPE ASSEMBLY

a.

Install 2 new gaskets to the front exhaust pipe assembly.


b.
A395328

Install the front exhaust pipe assembly with the 2 nuts.

Torque:
55 N*m (561 kgf*cm, 41 ft.*lbf)


c.
A395326

Install the 2 bolts to the center exhaust pipe assembly.

Torque:
43 N*m (440 kgf*cm, 32 ft.*lbf)


d.
A395327

Install the No. 1 exhaust pipe support bracket with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


e.

Connect the heated oxygen sensor (for Bank 2 Sensor 2) connector.


Hide 89465 3.INSTALL HEATED OXYGEN SENSOR (for Bank 1 Sensor 2)

a.
A135139E02
1.5,0.51 0.75,0.51 false 0.396,0.427 0.76,0.677 0.365,0.25 10 true SST

Using SST, install the heated oxygen sensor.

SST
09224-00010  

Torque:
40 N*m (408 kgf*cm, 30 ft.*lbf)

for use with SST

44 N*m (449 kgf*cm, 32 ft.*lbf)

for use without SST


HINT:
·

Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).

·

Make sure that SST and wrench are connected in a straight line.




b.

Connect the heated oxygen sensor (for Bank 1 Sensor 2) connector.


Hide 28800 4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).


Hide 5.INSPECT FOR EXHAUST GAS LEAK