88051A
1.INSTALL ION GENERATOR SUB-ASSEMBLY
Install the ion generator sub-assembly with the 3 screws.
Install the screws in the order shown in the illustration.
Engage the 2 claws to connect the air duct sub-assembly.
Connect the connector.
55302A
2.INSTALL UPPER INSTRUMENT PANEL