2011-2016 FJ Cruiser · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built from Aug 2009


1. REMOVE INTAKE AIR SURGE TANK
  1. Remove the intake air surge tank (Click here).


2. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)

  1. A226608
    Disconnect the oil control valve connector.

  1. Remove the bolt and oil control valve.

  1. Remove the O-ring from the oil control valve.


3. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)

  1. A221418
    Disconnect the oil control valve connector.

  1. Remove the bolt and oil control valve.

  1. Remove the O-ring from the oil control valve.


4. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)

  1. A226609
    Disconnect the oil control valve connector.

  1. Remove the bolt and oil control valve.

  1. Remove the O-ring from the oil control valve.


5. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)

  1. A226757
    Disconnect the oil control valve connector.

  1. Remove the bolt and oil control valve.

  1. Remove the O-ring from the oil control valve.

← ON-VEHICLE INSPECTION (from Aug 2009)INSPECTION (from Aug 2009) →