2011-2016 FJ Cruiser · Service Manual HEATER & AIR CONDITIONING SYSTEM

INSTALLATION

Removal / installation · Vehicles built from Nov 2010

Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2010 from Nov 2010


1. INSTALL LOWER DEFROSTER NOZZLE ASSEMBLY
  1. Engage the 4 claws and install the lower defroster nozzle.


2. INSTALL HEATER TO REGISTER DUCT ASSEMBLY
  1. Engage the 4 claws and install the heater to register duct.


3. INSTALL BLOWER UNIT ASSEMBLY

I102448
  1. Install the 2 screws and blower unit as shown in the illustration.


4. INSTALL INSTRUMENT PANEL REINFORCEMENT ASSEMBLY (for LHD)
(Click here)

5. INSTALL INSTRUMENT PANEL REINFORCEMENT ASSEMBLY (for RHD)
(Click here)
← INSTALLATION (Aug 2009 – Oct 2010)COMPONENTS (Jul 2007 – Jul 2014) →