2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jul 2007 – Jul 2009

Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2010 Nov 2010 – Jul 2013 Aug 2013 – Jul 2014 from Aug 2014


1. INSTALL NO. 3 CAMSHAFT SUB-ASSEMBLY

NOTICE:
Keep the camshaft level while it is being removed. The camshaft thrust clearance is very small and failing to keep it level could crack or damage the cylinder head journal surface, which receives the thrust force. This could subsequently lead the camshaft to seize or break. Perform the following steps to avoid such problems.

  1. A076490E03
    Align the yellow mark link with the timing mark (2 dot marks) of the camshaft timing gear as shown in the illustration.

  1. Apply new engine oil to the thrust portion and journal of the camshafts.

  1. A076491E01
    Temporarily put the No. 1 chain on the No. 2 chain of the camshaft timing gear.

  1. G036267E01
    Align the knock pin hole in the camshaft timing gear with the knock pin of the No. 3 camshaft, and insert the No. 3 camshaft into the camshaft timing gear.

  1. Temporarily install the camshaft timing gear set bolt.

  1. G036268E01
    Set the No. 3 camshaft onto the bank 2 cylinder head with the cam lobes of the No. 2 cylinder facing downward as shown in the illustration.

  1. A076494E01
    Install the 4 bearing caps in the proper locations as shown.

  1. Apply a light coat of engine oil to the threads and under the heads of the bearing cap bolts.

  1. A076487E05
    Using several steps, uniformly install and tighten the 8 bearing cap bolts in the sequence shown in the illustration.

    Torque:
    10 mm (0.39 in.) head:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
    12 mm (0.47 in.) head:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

  1. G036269E01
    Align the paint mark of the No. 1 chain with the timing marks of the camshaft timing gear.

  1. G036264E01
    Hold the hexagonal portion of the No. 3 camshaft with a wrench, and tighten the camshaft timing gear set bolt.

    Torque:
    100 N*m{ 1020 kgf*cm , 74 ft.*lbf }


2. INSTALL NO. 3 CHAIN TENSIONER ASSEMBLY

  1. A076289E01
    While pushing in the tensioner, insert a pin of φ 1.0 mm (0.039 in.) into the hole to hold it.

  1. A076496E01
    Temporarily install the camshaft timing gear and No. 3 chain tensioner and align the yellow mark links with the timing marks (1 dot mark and 2 dot marks) of the camshaft timing gears.

  1. Tighten the No. 3 chain tensioner bolt.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }


3. INSTALL NO. 4 CAMSHAFT SUB-ASSEMBLY

NOTICE:
Keep the camshaft level while it is being removed. The camshaft thrust clearance is very small and failing to keep it level could crack or damage the cylinder head journal surface, which receives the thrust force. This could subsequently lead the camshaft to seize or break. Perform the following steps to avoid such problems.

  1. G036270E01
    Align the knock pin hole in the camshaft timing gear with the knock pin of the No. 4 camshaft, and insert the No. 4 camshaft into the camshaft timing gear.

  1. Temporarily install the camshaft timing gear set bolt.

  1. A076498E01
    Install the 4 bearing caps in the proper locations as shown.

  1. Apply a light coat of engine oil to the threads of the bearing cap bolts.

  1. A076482E05
    Using several steps, uniformly install and tighten the 8 bearing cap bolts in the sequence shown in the illustration.

    Torque:
    10 mm (0.39 in.) head:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
    12 mm (0.47 in.) head:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

  1. G036261E01
    Hold the hexagonal portion of the No. 4 camshaft with a wrench, and tighten the camshaft timing gear set bolt.

    Torque:
    100 N*m{ 1020 kgf*cm , 74 ft.*lbf }

  1. Remove the pin from the No. 3 chain tensioner.

  1. G036298E01
    Release the chain tension between the camshaft timing gear (bank 1) and crankshaft timing gear by turning the crankshaft pulley clockwise slightly.


4. INSTALL CAMSHAFT

NOTICE:
Keep the camshaft level while it is being removed. The camshaft thrust clearance is very small and failing to keep it level could crack or damage the cylinder head journal surface, which receives the thrust force. This could subsequently lead the camshaft to seize or break. Perform the following steps to avoid such problems.

  1. A076518E03
    Align the yellow mark link with the timing mark (1 dot mark) of the camshaft timing gear as shown in the illustration.

  1. Apply new engine oil to the thrust portion and journal of the camshafts.

  1. A076519E01
    Temporarily install the No. 1 chain onto the No. 2 chain of the camshaft timing gear.

  1. G036280E01
    Align the knock pin hole in the camshaft timing gear with the knock pin of the No. 1 camshaft, and insert the No. 1 camshaft into the camshaft timing gear.

  1. Temporarily install the camshaft timing gear set bolt.

  1. G036281E01
    Install the No. 1 camshaft onto the bank 1 cylinder head with the cam lobes of the No. 1 cylinder facing downward as shown in the illustration.

  1. A076522E01
    Install the 4 bearing caps in the proper locations as shown.

  1. Apply a light coat of engine oil to the threads and under the heads of the bearing cap bolts.

  1. A076515E06
    Using several steps, uniformly install and tighten the 8 bearing cap bolts in the sequence shown in the illustration.

    Torque:
    10 mm (0.39 in.) head:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
    12 mm (0.47 in.) head:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

  1. G036282E01
    Rotate the No. 1 camshaft clockwise using a wrench so that the timing mark of the camshaft timing gear is aligned with the timing mark of the camshaft bearing cap.

  1. G036283E01
    Align the paint mark of the No. 1 chain with the timing mark of the camshaft timing gear.

  1. G036276E01
    Hold the hexagonal portion of the No. 1 camshaft with a wrench, and tighten the camshaft timing gear set bolt.

    Torque:
    100 N*m{ 1020 kgf*cm , 74 ft.*lbf }


5. INSTALL NO. 2 CHAIN TENSIONER ASSEMBLY

A076286E01
  1. While pushing in the tensioner, insert a pin of φ 1.0 mm (0.039 in.) into the hole to fix it.

  1. A076525E01
    Temporarily install the camshaft timing gear and No. 2 chain tensioner and align the yellow mark links with the timing marks (1 dot mark) of the camshaft timing gears.

  1. Tighten the No. 2 chain tensioner bolt.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }


6. INSTALL NO. 2 CAMSHAFT

NOTICE:
Keep the camshaft level while it is being removed. The camshaft thrust clearance is very small and failing to keep it level could crack or damage the cylinder head journal surface, which receives the thrust force. This could subsequently lead the camshaft to seize or break. Perform the following steps to avoid such problems.

  1. G036285E01
    Install the No. 2 camshaft onto the bank 1 cylinder head with the cam lobes of No. 1 cylinder facing upward as shown in the illustration.

  1. A076527E01
    Install the 4 bearing caps in the proper locations as shown.

  1. Apply a light coat of engine oil to the threads and under the heads of the bearing cap bolts.

  1. A076510E06
    Using several steps, uniformly install and tighten the 8 bearing cap bolts in the sequence shown in the illustration.

    Torque:
    10 mm (0.39 in.) head:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
    12 mm (0.47 in.) head:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

  1. G036286E01
    Rotate the No. 2 camshaft clockwise using a wrench so that the knock pin of the No. 2 camshaft is aligned with the knock pin hole in the camshaft timing gear.

  1. G036273E02
    Hold the hexagonal portion of the No. 2 camshaft with a wrench, and install the camshaft timing gear set bolt.

    Torque:
    100 N*m{ 1020 kgf*cm , 74 ft.*lbf }

  1. Remove the pin from the No. 2 chain tensioner.


7. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY

A076294E02
  1. While turning the stopper plate of the No. 1 chain tensioner clockwise, push in the plunger of the No. 1 chain tensioner as shown in the illustration.

  1. While turning the stopper plate of the tensioner counterclockwise, insert a bar of φ 3.5 mm (0.138 in.) into the holes in the stopper plate and No. 1 chain tensioner to fix the stopper plate.

  1. Install the No. 1 chain tensioner with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }

  1. Remove the bar from the No. 1 chain tensioner.

  1. Install a new gasket and the timing chain cover plate with the 4 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. A076530E01
    Turn the crankshaft pulley 2 complete revolutions slowly until its groove and the "0" timing mark of the timing chain cover are aligned.

  1. G036289E04
    Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing cap as shown in the illustration.


8. SET NO. 1 CYLINDER TO TDC/COMPRESSION

A076530E02
  1. Turn the crankshaft pulley until its groove and the "0" timing mark of the timing chain cover are aligned.

  1. G036289E04
    Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing caps as shown in the illustration.
    If not, turn the crankshaft 1 complete revolution (360°) and align the timing marks above.


9. INSPECT VALVE CLEARANCE

A076343E03
  1. Check the valves indicated in the illustration.

    1. Using a feeler gauge, measure the clearance between the valve lifter and camshaft.

      Valve clearance (Cold):
      Intake:
      0.15 to 0.25 mm (0.006 to 0.010 in.)
      Exhaust:
      0.29 to 0.39 mm (0.011 to 0.015 in.)

    2. Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter.

  1. A076344E03
    Turn the crankshaft 240° clockwise, and check the valves indicated in the illustration.

    1. Using a feeler gauge, measure the clearance between the valve lifter and camshaft.

      Valve clearance (Cold):
      Intake:
      0.15 to 0.25 mm (0.006 to 0.010 in.)
      Exhaust:
      0.29 to 0.39 mm (0.011 to 0.015 in.)

    2. Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter.

  1. A076345E07
    Turn the crankshaft 240° clockwise, and check the valves indicated in the illustration.

    1. Using a feeler gauge, measure the clearance between the valve lifter and camshaft.

      Valve clearance (Cold):
      Intake:
      0.15 to 0.25 mm (0.006 to 0.010 in.)
      Exhaust:
      0.29 to 0.39 mm (0.011 to 0.015 in.)

    2. Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter.


10. ADJUST VALVE CLEARANCE

A076530E02

  1. Set the No. 1 cylinder to TDC/compression.

    1. Turn the crankshaft pulley until its groove and the "0" timing mark of the timing chain cover are aligned.

    2. G036289E04
      Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing caps as shown in the illustration.
      If not, turn the crankshaft 1 complete revolution (360°) and align the timing marks as above.

    3. G036271E01
      Place paint marks on the No. 1 chain links corresponding to the timing marks of the camshaft timing gears.

  1. Remove the No. 1 chain tensioner assembly.

  1. Remove the No. 2 camshaft.

  1. Remove the No. 2 chain tensioner assembly.

  1. Remove the camshaft.

  1. Remove the No. 4 camshaft sub-assembly.

  1. Remove the No. 3 chain tensioner assembly.

  1. Remove the No. 3 camshaft sub-assembly.

  1. Remove the valve lifters.

  1. A001082E01
    Determine the replacement valve lifter size according to the following formulas and charts:

    1. Using a micrometer, measure the thickness of the removed lifter.

    2. Calculate the thickness of a new lifter so that the valve clearance comes within the specified value.

      T:
      Thickness of removed lifter

      A:
      Measured valve clearance

      N:
      Thickness of new lifter

      Intake:
      N = T + (A - 0.20 mm (0.008 in.))

      Exhaust:
      N = T + (A - 0.34 mm (0.013 in.))

    3. Select a new lifter with a thickness as close as possible to the calculated value.

      HINT:
      Lifters are available in 35 sizes in increments of 0.020 mm (0.0008 in.), from 5.060 mm (0.1992 in.) to 5.740 mm (0.2260 in.).


      A126377E01

      A126378E01

      HINT:
      New lifter thickness [mm (in.)]
      Lifter No.
      Thickness
      Lifter No.
      Thickness
      Lifter No.
      Thickness
      06
      5.060 (0.1992)
      30
      5.300 (0.2087)
      54
      5.540 (0.2181)
      08
      5.080 (0.2000)
      32
      5.320 (0.2094)
      56
      5.560 (0.2189)
      10
      5.100 (0.2008)
      34
      5.340 (0.2102)
      58
      5.580 (0.2197)
      12
      5.120 (0.2016)
      36
      5.360 (0.2110)
      60
      5.600 (0.2205)
      14
      5.140 (0.2024)
      38
      5.380 (0.2118)
      62
      5.620 (0.2213)
      16
      5.160 (0.2031)
      40
      5.400 (0.2126)
      64
      5.640 (0.2220)
      18
      5.180 (0.2039)
      42
      5.420 (0.2134)
      66
      5.660 (0.2228)
      20
      5.200 (0.2047)
      44
      5.440 (0.2142)
      68
      5.680 (0.2236)
      22
      5.220 (0.2055)
      46
      5.460 (0.2150)
      70
      5.700 (0.2244)
      24
      5.240 (0.2063)
      48
      5.480 (0.2157)
      72
      5.720 (0.2252)
      26
      5.260 (0.2071)
      50
      5.500 (0.2165)
      74
      5.740 (0.2260)
      28
      5.280 (0.2079)
      52
      5.520 (0.2173)


  1. Install the No. 3 camshaft sub-assembly.

  1. Install the No. 3 chain tensioner assembly.

  1. Install the No. 4 camshaft sub-assembly.

  1. Install the camshaft.

  1. Install the No. 2 chain tensioner assembly.

  1. Install the No. 2 camshaft.

  1. Install the No. 1 chain tensioner assembly.

    1. G036289E03
      Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing cap as shown in the illustration.


11. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH
  1. Remove any old packing (FIPG) material.

    HINT:
    Do not drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.

  1. A076311E02
    Apply a continuous bead of seal packing (diameter 2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and timing chain cover as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or the equivalent

    NOTICE:
    Install the cylinder head cover within 3 minutes of applying the seal packing. Tighten the cylinder head cover bolts and nuts within 15 minutes of installing the cylinder head cover. Otherwise, the seal packing must be removed and reapplied.

  1. Install the seal washers onto the bolts.

  1. A076503E03
    Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

    Torque:
    Bolt A:
    10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }
    Bolt B:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
    Nut:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

    HINT:
    Each bolt length is as follows.
    Bolt
    Length
    A
    25 mm (0.98 in.)
    B
    60 mm (2.36 in.)


12. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
  1. Remove any old packing (FIPG) material.

    HINT:
    Do not drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.

  1. A076310E02
    Apply a continuous bead of seal packing (diameter 2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and timing chain cover as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or the equivalent

    NOTICE:
    Install the cylinder head cover within 3 minutes of applying the seal packing. Tighten the cylinder head cover bolts and nuts within 15 minutes of installing the cylinder head cover. Otherwise, the seal packing must be removed and reapplied.

  1. Install the seal washers onto the bolts.

  1. A072943E03
    Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

    Torque:
    Bolt A:
    10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }
    Bolt B:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
    Nut:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

    HINT:
    Each bolt length is as follows.
    Bolt
    Length
    A
    25 mm (0.98 in.)
    B
    60 mm (2.36 in.)


13. INSTALL IGNITION COIL ASSEMBLY

A126385E01
  1. For Bank 1:

    1. Install the 3 ignition coils with the 3 bolts.

      Torque:
      10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }

    2. Connect the 3 ignition coil connectors.

  1. A126386E01
    For Bank 2:

    1. Install the 3 ignition coils with the 3 bolts.

      Torque:
      10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }

    2. Connect the 3 ignition coil connectors.


14. INSTALL INTAKE AIR SURGE TANK
  1. Install a new gasket onto the intake air surge tank.

  1. A075648
    Using a socket hexagon wrench 8, install the intake air surge tank with the 4 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

  1. Install the 2 nuts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

  1. A075646E01
    Install the 3 wire harness clamps and hose clamp.

  1. Connect the throttle body with motor connector.

  1. Connect the 2 VSV connectors.

  1. A075645
    Connect the ventilation hose.

  1. A126449
    Connect the fuel vapor feed hose.

  1. A126395
    Connect the 2 water by-pass hoses.


15. INSTALL NO. 2 SURGE TANK STAY

  1. A126391
    Install the No. 2 surge tank stay with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


16. INSTALL NO. 1 SURGE TANK STAY

  1. A126389
    Install the No. 1 surge tank stay with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


17. INSTALL OIL BAFFLE PLATE

  1. A126390
    Install the oil baffle plate with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }


18. INSTALL THROTTLE BODY BRACKET

  1. A126392
    Install the throttle body bracket with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


19. INSTALL AIR CLEANER ASSEMBLY

  1. A075596E01
    Install the air cleaner onto the throttle body.

  1. Connect the air cleaner hose to the air cleaner.

  1. Install the air cleaner with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. A075595E01
    Connect the mass air flow meter connector.

  1. Engage the 2 wire harness clamps.

  1. Connect the vacuum hose.

  1. A075594E01
    Connect the No. 2 ventilation hose.


20. ADD ENGINE COOLANT
  1. Pour coolant into the radiator until it overflows.

    Capacity:
    Transmission
    Capacity
    Manual Transmission
    9.4 liters (9.9 Us qts, 8.3 Imp. qts)
    Automatic Transmission
    9.8 liters (10.4 Us qts, 8.6 Imp. qts)

    NOTICE:
    Do not substitute plain water for engine coolant.

    HINT:
    1. Use of improper coolants may damage the engine cooling system.
    2. Use only TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
    3. New TOYOTA vehicles are filled with TOYOTA SLLC (color is pink, premixed ethylene glycol concentration is approximately 50 % and freezing temperature is -35°C (-31°F)). When replacing the coolant, TOYOTA SLLC is recommended.

  1. Check the coolant level inside the radiator by squeezing the inlet and outlet radiator hoses several times by hand. If the coolant level goes down, add coolant.

  1. Install the radiator cap securely.

  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Warm up the engine until the cooling fan operates.

    1. Set the air conditioning as follows while warming up the engine.

      Item
      Condition
      Fan Speed
      Any setting except OFF
      Temperature
      Toward WARM
      Air Conditioning Switch
      OFF

    2. Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine until the cooling fan operates.

      NOTICE:
      1. Make sure that the radiator reservoir still has some coolant in it.
      2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
      3. If there is not enough coolant, the engine may burn out or overheat.

  1. Squeeze the inlet and outlet radiator hoses several times by hand while warming up the engine to bleed the air.

    CAUTION:
    When pressing the radiator hoses:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the fan.

  1. Stop the engine and wait until the coolant cools down.

  1. Remove the radiator cap and check the coolant level inside the radiator.

  1. If the coolant level is below the full level, repeat the operation until the coolant level remains at the full level.

  1. Check the coolant level inside the radiator reservoir tank again. If it is below the full level, add coolant.


21. INSPECT FOR COOLANT LEAK
  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Pump it to 177 kPa (1.8 kgf/cm2 25.7 psi), then check for leakage.


22. INSPECT FOR ENGINE OIL LEAK

23. INSPECT IGNITION TIMING

NOTICE:
  1. Turn all the electrical systems OFF.
  2. Conduct the inspection when the cooling fan motor is turned OFF.

  1. Warm up the engine.

  1. When using the intelligent tester:

    1. Connect the intelligent tester to the DLC3.

    2. Select the following menu items: Powertrain / Engine and ECT / Date List / IGN Advance.

    3. Inspect the ignition timing during idling.

      Ignition timing:
      7 to 24°CA BTDC during idling (Transmission in neutral position)

    4. Check that the ignition timing advances immediately when the engine speed is increased.

  1. A118802E01
    When not using intelligent tester:

    1. Using SST, connect the terminals 13 (TC) and 4 (CG) of the DLC3.

      SST
      09843-18040  

      NOTICE:
      Do not connect the terminals incorrectly as it causes breakage of the engine.

    2. Remove the air cleaner.

    3. A076315E02
      Pull out the wire harness shown in the illustration.

    4. Connect the tester probe of a timing light to the wire of the ignition coil connector for the No. 1 cylinder.

      NOTICE:
      1. Use timing light that detects the first signal.
      1. After checking, wrap the wire harness with tape.

    5. A076316E01
      Inspect the ignition timing during idling.

      Ignition timing:
      8 to 12°CA BTDC during idling (Transmission in neutral position)

    6. Remove SST from the DLC3.

    7. Inspect the ignition timing during idling.

      Ignition timing:
      7 to 24°CA BTDC during idling (Transmission in neutral position)

    8. Install the air cleaner.


24. INSTALL V-BANK COVER

  1. A126475
    Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

← INSPECTION (Jul 2007 – Jul 2009)INSTALLATION (Aug 2009 – Oct 2010) →