P0778 Pressure Control Solenoid "B" Electrical (Shift Solenoid Valve SL2)
Diagnostic trouble codes · Vehicles built from Aug 2009
Versions by build date: Jul 2007 – Jul 2009 from Aug 2009
DESCRIPTION
Shifting from 1st to 5th is performed in combination with the ON and OFF operation of the shift solenoid valves S1, S2, SR, SL1 and SL2 which are controlled by the ECM. If an open or short circuit occurs in any of the shift solenoid valves, the ECM controls the remaining normal shift solenoid valves to allow the vehicle to be driven smoothly (Click here).| DTC No. |
DTC Detection Conditions |
Trouble Areas |
| P0778 |
The ECM checks for an open or short in the shift solenoid valve SL2 circuit (1-trip detection logic):
|
|
MONITOR DESCRIPTION
This DTC indicates an open or short in the shift solenoid valve SL2 circuit. The ECM controls the gearshift by turning the shift solenoid valves "ON/OFF". When there is an open or short circuit in any shift solenoid valve circuit, the ECM detects the problem, illuminates the MIL and stores the DTC. And the ECM performs the fail-safe function and turns the other functioning shift solenoid valves "ON/OFF". (If an open or short circuit is detected, the ECM cuts the current to the circuit.)If the ECM detects an open or short in the shift solenoid valve SL2 circuit, the ECM determines that there is a malfunction (Click here).
WIRING DIAGRAM


INSPECTION PROCEDURE
- HINT:
- The shift solenoid valve SL2 is turned on/off normally when the shift lever is in the D position:
Gearshift controlled by ECM
1st
2nd
3rd
4th
5th
Shift solenoid valve SL2
ON
ON
ON
ON
OFF
| 1. INSPECT TRANSMISSION WIRE (SL2) |
Disconnect the transmission wire connector from the transmission.

Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
11 (SL2+) - 3 (SL2-)
20°C (68°F)
5.0 to 5.6 Ω
11 (SL2+) - Body ground
Always
10 kΩ or higher
3 (SL2-) - Body ground
Always
10 kΩ or higher
Text in Illustration *1
Component without harness connected:
(Transmission Wire)
|
|
||||
| OK | |
| 2. CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE - ECM) |
Connect the transmission wire connector to the transmission.

Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
B48-31 (SL2+) - B49-34 (SL2-)
20°C (68°F)
5.0 to 5.6 Ω
B48-31 (SL2+) - Body ground
Always
10 kΩ or higher
B49-34 (SL2-) - Body ground
Always
10 kΩ or higher
Text in Illustration *1
Rear view of wire harness connector:
(to ECM)
|
|
||||
| OK | ||
| ||
| 3. INSPECT SHIFT SOLENOID VALVE SL2 |
Remove the shift solenoid valve SL2.

Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
1 - 2
20°C (68°F)
5.0 to 5.6 Ω
Text in Illustration *1
Component without harness connected:
(Shift Solenoid Valve SL2)
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the valve.
- OK:
- The solenoid makes operating sounds.
|
|
||||
| OK | ||
| ||