1.
DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
2.
DISCONNECT CABLE FROM POSITIVE BATTERY TERMINAL
3.
REMOVE BATTERY HOLD DOWN CLAMP
Loosen the 2 nuts and remove the battery hold down clamp.
4.
REMOVE BATTERY
5.
REMOVE BATTERY TRAY
6.
REMOVE V-BANK COVER
Raise the front of the V-bank cover to disengage the 2 cushions of the V-bank cover from the 2 pins.
Text in Illustration
*1
Cushion
*2
Pin
*3
Hook
*4
No. 1 V-bank Cover Bracket
Disengage the 2 hooks to remove the V-bank cover from the No. 1 V-bank cover bracket.
7.
REMOVE FAN AND GENERATOR V BELT
While turning the belt tensioner counterclockwise, align the service hole for the belt tensioner and the belt tensioner fixing position, and then insert a bar of φ 6 mm (0.236 in.) into the service hole to fix the belt tensioner in place.
HINT:
The pulley bolt for the belt tensioner has a left-hand thread.
Remove the V belt.
8.
REMOVE WIRING HARNESS CLAMP BRACKET
Disconnect the clamp.
Remove the bolt and wire harness clamp bracket.
9.
REMOVE NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
Remove the 3 bolts and No. 2 exhaust manifold heat insulator from the exhaust manifold sub-assembly LH.
10.
REMOVE FRONT FENDER APRON SEAL LH
Remove the 5 clips and front fender apron seal LH from the front fender apron sub-assembly LH.
11.
REMOVE GENERATOR ASSEMBLY
Open the terminal cap.
Remove the nut and disconnect the wire harness from terminal B.
Disconnect the generator connector from the generator assembly.
Remove the 2 bolts and disconnect the wire harness.
Disconnect the wire harness clamp.
Remove the bolt and disconnect the generator bracket from the cylinder block.