INSTALLATION
Removal / installation · Vehicles built Jul 2007 – Jul 2009
Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2010 Nov 2010 – Jul 2014 from Aug 2014
| 1. INSTALL GENERATOR ASSEMBLY |
![]() ![]() |
Install the generator assembly with the 2 bolts.
- Torque:
- 43 N*m{ 438 kgf*cm , 32 ft.*lbf }
Install the wire harness clamp bracket with the 2 bolts.

- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Connect the wire harness.
Connect the wire harness to terminal B and install the nut.

- Torque:
- 10 N*m{ 100 kgf*cm , 7 ft.*lbf }
Connect the connector to the generator assembly.
Install the wire harness stay with the bolt.

- Torque:
- 5.8 N*m{ 59 kgf*cm , 51 in.*lbf }
| 2. INSTALL FAN & GENERATOR V BELT |
![]() ![]() |
While turning the belt tensioner counterclockwise, align the holes as shown, and then insert a bar of 6 mm (0.24 in.) into the holes to fix the belt tensioner.
Install the V-ribbed belt.


While turning the belt tensioner counterclockwise, remove the bar.
If it is hard to install the V-ribbed belt, perform the following procedure:
Put the V-ribbed belt on all parts except the P/S pump, as shown in the illustration.
While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump.
| 3. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY |
Install the No. 1 engine under cover with the 4 bolts.
- Torque:
- 29 N*m{ 296 kgf*cm , 21 ft.*lbf }
| 4. INSTALL V-BANK COVER |
Install the V-bank cover with the 2 nuts.

- Torque:
- 7.5 N*m{ 76 kgf*cm , 66 in.*lbf }
| 5. INSTALL BATTERY |
- Torque:
- 3.9 N*m{ 40 kgf*cm , 35 in.*lbf }


