2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jul 2007 – Jul 2009

Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Jul 2014 from Aug 2014


1. INSTALL DUTY VACUUM SWITCHING VALVE

  1. G036125E01
    Connect the hose to the vacuum switching valve.

  1. Install the vacuum switching valve with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. G036126E01
    Connect the vapor feed hose.

  1. Connect the connector.


2. INSTALL V-BANK COVER

  1. A126475
    Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
3.9 N*m{ 40 kgf*cm , 35 in.*lbf }

← INSPECTION (from Aug 2009)INSTALLATION (Aug 2009 – Jul 2014) →