REMOVAL
Removal / installation · Vehicles built from Nov 2010
Versions by build date: Jul 2007 – Oct 2010 from Nov 2010
| 1.
DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL |
|
| 2.
REMOVE INSTRUMENT PANEL GARNISH LH
|
 |
- Remove screw <G>.
Disengage the 3 clips and remove the instrument panel garnish.
- NOTICE:
- Pull the instrument panel garnish up at an angle of 45° to remove it.
- Do not damage the surface of the instrument panel when removing it.
| 3.
REMOVE INSTRUMENT PANEL GARNISH RH
|
 |
- Remove screw <G>.
Disengage the 3 clips and remove the instrument panel garnish.
- NOTICE:
- Pull the instrument panel garnish up at an angle of 45° to remove it.
- Do not damage the surface of the instrument panel when removing it.
| 4.
REMOVE INTEGRATION CONTROL PANEL ASSEMBLY
|
 |
- Remove the 2 screws.
Disengage the 4 clips and remove the integration control panel assembly.
Disconnect the 3 connectors.
| 5.
REMOVE RADIO RECEIVER ASSEMBLY
|
 |
- Remove the 4 bolts.
Disconnect the connectors and remove the radio receiver.
| 6.
REMOVE CLOCK ASSEMBLY |
 |
- Disengage the 2 claws and remove the clock assembly.
- HINT:
- Pull the clock assembly out in the direction shown in the illustration to remove it.