2011-2016 FJ Cruiser · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built Aug 2009 – Oct 2010

Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2010 from Nov 2010


1. REMOVE CYLINDER HEAD SUB-ASSEMBLY (for Bank 1)
  1. Remove the cylinder head (Click here).


2. REMOVE NO. 1 WATER OUTLET PIPE

  1. A178539
    Disconnect the 4 wire harness clamps.

  1. Remove the 2 nuts, bolt and No. 1 water outlet pipe.


3. REMOVE KNOCK SENSOR

  1. A075662
    Disconnect the 2 sensor connectors.

  1. Remove the 2 bolts and 2 sensors.

← REMOVAL (Jul 2007 – Jul 2009)REMOVAL (from Nov 2010) →