2011-2016 FJ Cruiser · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built from Aug 2014

Versions by build date: Aug 2009 – Jul 2014 from Aug 2014


1. REMOVE V-BANK COVER

  1. A229925E04
    Raise the front of the V-bank cover to disengage the 2 cushions of the V-bank cover from the 2 pins.
    Text in Illustration 
    *1
    Cushion
    *2
    Pin
    *3
    Hook
    *4
    No. 1 V-bank Cover Bracket

  1. Disengage the 2 hooks to remove the V-bank cover from the No. 1 V-bank cover bracket.


2. REMOVE AIR CLEANER CAP SUB-ASSEMBLY WITH NO. 1 AIR CLEANER HOSE

  1. A227193
    Disconnect the MAF meter connector.

  1. Disengage the 4 wire harness clamps.

  1. Disconnect the ventilation hose and vacuum hose.

  1. Remove the bolt.

  1. Loosen the No. 1 air cleaner hose clamp.

  1. Release the 4 hinges.

  1. Remove the air cleaner cap and hose.


3. REMOVE NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
Click here

4. REMOVE NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
Click here

5. REMOVE IGNITION COIL ASSEMBLY

  1. A226756
    Disconnect the 6 ignition coil assembly connectors.

  1. Remove the 6 bolts and 6 ignition coil assemblies from the cylinder head cover sub-assembly.


6. REMOVE SPARK PLUG

  1. A226864
    Using a 16 mm spark plug wrench, remove the 6 spark plugs from the cylinder head sub-assembly.

← REMOVAL (Aug 2009 – Jul 2014)INSTALLATION (Aug 2009 – Jul 2014) →