2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Aug 2009 – Oct 2010

Versions by build date: Aug 2009 – Oct 2010 Nov 2010 – Jul 2014 from Aug 2014


1. INSTALL AIR FUEL RATIO SENSOR (for Bank 2 Sensor 1)

  1. A223685E02
    Using SST, tighten the air fuel ratio sensor.
    Text in Illustration 
    *a
    Fulcrum Length
    SST
    09224-00010  

    Torque:
    without SST:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }
    with SST:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }

    HINT:
    1. The "with SST" torque value is effective when using SST with a fulcrum length of 30 mm (1.18 in.).
    2. The "with SST" torque value is effective when using a torque wrench with a fulcrum length of 300 mm (11.81 in.) (Click here).
    3. This torque value is effective when SST is parallel to the torque wrench.


2. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH

A222094E02
  1. Install a new gasket onto the cylinder head.

    Text in Illustration 
    *a
    Protrusion
    V100135
    Front

    NOTICE:
    Be careful of the installation direction.

  1. Temporarily install the manifold with the 6 nuts.

  1. A222093E01
    Tighten the 6 nuts in the sequence shown in the illustration.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the air fuel ratio sensor connector.


3. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
  1. Install the heat insulator with the 3 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


4. INSTALL MANIFOLD STAY
  1. Install the manifold stay with the 3 bolts.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }


5. INSTALL AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1)

  1. A223683E02
    Using SST, tighten the air fuel ratio sensor.
    Text in Illustration 
    *a
    Fulcrum Length
    SST
    09224-00010  

    Torque:
    without SST:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }
    with SST:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }

    HINT:
    1. The "with SST" torque value is effective when using SST with a fulcrum length of 30 mm (1.18 in.).
    2. The "with SST" torque value is effective when using a torque wrench with a fulcrum length of 300 mm (11.81 in.) (Click here).
    3. This torque value is effective when SST is parallel to the torque wrench.


6. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH

A222095E02
  1. Install a new gasket onto the cylinder head.

    Text in Illustration 
    *a
    Protrusion
    V100135
    Front

    NOTICE:
    Be careful of the installation direction.

  1. Temporarily install the manifold with the 6 nuts.

  1. A222090E01
    Tighten the 6 nuts in the sequence shown in the illustration.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the air fuel ratio sensor connector.


7. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
  1. Install the heat insulator with the 3 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


8. INSTALL NO. 2 MANIFOLD STAY
  1. Install the manifold stay with the 3 bolts.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }


9. INSTALL FRONT NO. 2 EXHAUST PIPE ASSEMBLY
  1. Install a new gasket onto the exhaust manifold LH.

  1. Install a new gasket onto the front No. 2 exhaust pipe.

  1. Install the front No. 2 exhaust pipe with the 2 bolts, 2 nuts and the exhaust pipe support.

    Torque:
    Nut:
    54 N*m{ 554 kgf*cm , 40 ft.*lbf }
    Bolt:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }


10. INSTALL EXHAUST PIPE STOPPER BRACKET
  1. Install the exhaust pipe stopper bracket with the 2 bolts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }


11. INSTALL FRONT EXHAUST PIPE ASSEMBLY

A128853
  1. Check the free length.

    1. Using vernier calipers, measure the free length of the compression spring.

      Minimum:
      40.5 mm (1.594 in.)

      If the free length is less that the minimum, replace the compression spring.

  1. A128852E02
    Install a new gasket onto the front exhaust pipe.

    1. Using a wooden block and plastic-faced hammer, tap in a new gasket until it is flush with the front exhaust pipe end.

      Text in Illustration 
      *1
      Gasket
      *2
      Wooden Block
      *3
      Plastic-faced Hammer

      NOTICE:
      1. Make sure that the gasket is in the correct direction when installing.
      2. Do not reuse the removed gasket.
      3. Do not push in the gasket with the exhaust pipe when connecting it.

  1. Install a new gasket onto the exhaust manifold RH.

  1. Install the front exhaust pipe with 2 new nuts, 2 bolts and the 2 compression springs.

    Torque:
    Nut:
    54 N*m{ 554 kgf*cm , 40 ft.*lbf }
    Bolt:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }


12. INSTALL AIR CLEANER CASE SUB-ASSEMBLY
  1. Install the air cleaner case sub-assembly with the 3 bolts.


13. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
  1. Install the air cleaner filter element sub-assembly to the air cleaner case sub-assembly.


14. INSTALL AIR CLEANER CAP AND HOSE

  1. A227195E01
    Install the air cleaner cap with the 4 hinges.

  1. Install the No. 1 air cleaner hose with the clamp.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    Text in Illustration 
    *a
    Protrusion
    *b
    Groove
    *c
    Top
    *d
    Front
    *e
    RH
    *f
    Paint mark of the hose

  1. Install the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the ventilation hose and vacuum hose.

    HINT:
    The direction of the hose clamp is indicated in the illustration.

  1. Engage the 4 wire harness clamps.

  1. Connect the MAF meter connector.


15. INSTALL V-BANK COVER
  1. Engage the 2 V-bank cover hooks to the bracket.

  1. Align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to engage the pins.


16. INSPECT FOR EXHAUST GAS LEAK

17. INSTALL FRONT FENDER APRON SEAL LH
  1. Install the apron seal with the 5 clips.


18. INSTALL FRONT FENDER APRON SEAL RH
  1. Install the apron seal with the 4 clips.


19. INSTALL NO. 1 FENDER APRON TO FRAME SEAL LH
  1. Install the frame seal with the 5 clips.


20. INSTALL NO. 1 FENDER APRON TO FRAME SEAL RH
  1. Install the frame seal with the 5 clips.

← REMOVAL (from Aug 2014)INSTALLATION (Nov 2010 – Jul 2014) →