2014-2019 Hiace · Service Manual ENGINE

DISASSEMBLY

Removal / installation · Vehicles built from Oct 2014


1. REMOVE GENERATOR WITH CLUTCH PULLEY
  1. Remove the generator pulley cap.

  1. A115866E01
    Install SST to the pulley and vise as shown in the illustration.
    SST
    09820-63020  

  1. Mount SST (A) in a vise.

  1. A115874E01
    Turn SST (B) clockwise, and loosen the pulley.

  1. Remove the pulley.


2. REMOVE GENERATOR REAR END COVER

  1. A079302
    Remove the 3 nuts and generator rear end cover.


3. REMOVE TERMINAL INSULATOR

  1. A079342
    Remove the terminal insulator.


4. REMOVE GENERATOR BRUSH HOLDER ASSEMBLY

  1. A079303
    Remove the 2 screws and generator brush holder assembly.


5. REMOVE GENERATOR COIL ASSEMBLY

  1. A079304
    Remove the 4 through bolts.

  1. A115875E01
    Using SST, remove the generator coil.
    SST
    09950-40011   (09951-04020, 09952-04010, 09953-04020, 09954-04010, 09955-04071, 09957-04010, 09958-04011)

  1. Remove the generator washer.


6. REMOVE GENERATOR ROTOR ASSEMBLY
  1. Remove the generator rotor from the drive end frame.


7. INSPECT GENERATOR DRIVE END FRAME BEARING

  1. A079307
    Inspect than the bearing is not rough or worn. If necessary, replace the bearing.


8. REMOVE GENERATOR DRIVE END FRAME BEARING

  1. A079311
    Remove the 4 screws and bearing retainer.

  1. A115881E01
    Using SST, tap out the bearing.
    SST
    09950-60010   (09951-00250)
    09950-70010   (09951-07100)

← REMOVAL (from Oct 2014)INSPECTION (from Oct 2014) →