INSTALLATION
Removal / installation · Vehicles built Oct 2014 – Dec 2014
Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017
| 1. INSTALL CHARCOAL CANISTER ASSEMBLY |
Install the charcoal canister assembly to the bracket.
Connect the 2 purge line hoses, and slide the 2 clamps to secure the hoses.
| 2. INSTALL BATTERY CARRIER |
Install the battery carrier with the 3 bolts.
- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Attach the wire harness clamp to the battery carrier.
Connect the battery thermometer sensor connector.
| 3. INSTALL BATTERY |
| 4. INSTALL BATTERY CLAMP SUB-ASSEMBLY |
Attach the hook of the battery clamp sub-assembly to the battery carrier.
Temporarily tighten the nut.
Adjust the battery clamp sub-assembly position.
Tighten the nut.
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
| 5. CONNECT CABLE TO POSITIVE BATTERY TERMINAL |
Install the positive (+) battery terminal to the battery and tighten the nut.
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
| 6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
Install the negative (-) battery terminal to the battery and tighten the nut.
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
- NOTICE:
- When disconnecting the cable some systems need to be initialized after the cable is reconnected (Click here).
| 7. PERFORM INITIALIZATION |
