INSPECTION
Inspection · Vehicles built from Oct 2014
| INSPECT VANE PUMP SHAFT AND BUSHING IN FRONT VANE PUMP HOUSING |
Using a micrometer and vernier calipers, measure the oil clearance.

- Maximum oil clearance:
- 0.07 mm (0.0028 in.)
| INSPECT VANE PUMP ROTOR AND VANE PUMP PLATES |
Using a micrometer, measure the thickness of the vane pump plates.

- Standard thickness:
- 1.397 to 1.403 mm (0.0550 to 0.0552 in.)
Using a feeler gauge, measure the clearance between a side face of the vane pump rotor groove and the vane pump plates.
- Maximum clearance:
- 0.03 mm (0.0012 in.)
| INSPECT FLOW CONTROL VALVE |
Coat the flow control valve with power steering fluid and check that it falls smoothly into the flow control valve hole under its own weight.
If it lacks smoothness, replace the vane pump assembly.
Check the flow control valve for leakage. Close one of the holes and apply compressed air, 392 to 490 kPa (4 to 5 kgf/cm2, 57 to 71 psi), into the opposite side hole, and confirm that air does not come out from the end holes.

If air leaks, replace the vane pump assembly.
| INSPECT FLOW CONTROL VALVE COMPRESSION SPRING |
Using vernier calipers, measure the free length of the flow control valve compression spring.

- Minimum free length:
- 32.3 mm (1.272 in.)
| INSPECT PRESSURE PORT UNION |
| INSPECT TOTAL PRELOAD |
Check that the pump rotates smoothly without abnormal noise.
Temporarily install the vane pump pulley set nut to the vane pump shaft.
Using a torque wrench, check the rotating torque.

- Rotating torque:
- 0.27 N*m (2.8 kgf*cm , 2.4 in.*lbf) or less
