2014-2019 Hiace · Service Manual STEERING

REASSEMBLY

Removal / installation · Vehicles built from Oct 2014

NOTICE:
When installing, coat the parts indicated by arrows with power steering fluid (Click here).


1. INSTALL VANE PUMP HOUSING OIL SEAL
  1. Coat a new vane pump housing oil seal lip with power steering fluid.

  1. C106283E01
    Using SST and a press, install the vane pump housing oil seal to the front vane pump housing.
    SST
    09950-60010   (09951-00320)
    09950-70010   (09951-07100)

    NOTICE:
    Make sure that the vane pump housing oil seal is installed in the correct direction as shown in the illustration.


2. INSTALL VANE PUMP SHAFT

  1. C106284E01
    Coat the inside surface of the bushing in the front vane pump housing with power steering fluid.

  1. Gradually insert the vane pump shaft from the pulley side.


3. INSTALL VANE PUMP ROTOR

  1. C106285
    Install the vane pump rotor.

    HINT:
    The vane pump rotor has no specific direction.

  1. Using a snap ring expander, install a new vane pump shaft snap ring to the vane pump shaft.

  1. Coat all 10 vane pump plates with power steering fluid.

  1. D030335E02
    Install the vane pump plates with the round end facing outward.

    NOTICE:
    Make sure that the vane pump plates are installed in the correct direction.


4. INSTALL VANE PUMP CAM RING

  1. C106286E01
    Align the holes of the vane pump cam ring with the 2 straight pins, and install the vane pump cam ring with the inscribed mark facing upward.

    NOTICE:
    Make sure that the cam ring is installed in the correct direction.


5. INSTALL REAR VANE PUMP SIDE PLATE

  1. C101969
    Coat a new O-ring with power steering fluid and install it onto the rear vane pump side plate.

  1. C106287
    Align the groove of the cam ring with that of the rear vane pump side plate, and install the rear vane pump side plate.

  1. C106288
    Install the wave washer so that its protrusions fit into the slots in the rear vane pump side plate.


6. INSTALL REAR VANE PUMP HOUSING
  1. Install a new gasket.

  1. Coat a new O-ring with power steering fluid and install it into the rear vane pump housing.

  1. C106279
    Install the rear vane pump housing with the 4 bolts.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }


7. INSPECT PRELOAD
  1. Check that the pump rotates smoothly without abnormal noise.

  1. Temporarily install the vane pump pulley set nut to the vane pump shaft.

  1. C106289
    Using a torque wrench, check the rotating torque.

    Rotating torque:
    0.27 N*m (2.8 kgf*cm , 2.4 in.*lbf) or less


8. INSTALL PRESSURE PORT UNION
  1. Coat the compression spring and the flow control valve with power steering fluid.

  1. C106278
    Install the compression spring and the flow control valve.

  1. Coat a new O-ring with power steering fluid and install it onto the pressure port union.

  1. Install the pressure port union to the front vane pump housing.

    Torque:
    83 N*m{ 846 kgf*cm , 61 ft.*lbf }


9. INSTALL POWER STEERING SUCTION PORT UNION
  1. Coat a new O-ring with power steering fluid and install it to the suction port union.

  1. C106277
    Install the suction port union to the front vane pump housing with the bolt.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

← INSPECTION (from Oct 2014)INSTALLATION (from Oct 2014) →